How I Saved My Clients $1,000,000: Woolooware Shores Design Review

Issue Identified: During the drafting phase of a recent commercial project, I encountered a critical issue involving clashes between downpipes and structural steel due to insufficient space for hydraulic piping routing. Discovery and Verification: Upon receiving architectural and structural drawings, I began modelled the structure and identified conflicts where downpipes from the gutters intersected with … Continue reading How I Saved My Clients $1,000,000: Woolooware Shores Design Review