THE ENTRANCE HOTEL is a hall structure, and TEK1, a dedicated steel detailer, played a pivotal role in its realization. Specializing in All Steels, TEK1 meticulously executed the installation of anchor bolt steel columns, beams, braces, and purlins.
As a steel detailer, TEK1 raised multiple Requests for Information (RFIs) along with corresponding proposals. These RFIs contributed to refining the project details, showcasing TEK1’s commitment to precision in steel detailing.
The client’s prompt response to TEK1’s RFIs facilitated effective communication and adjustments. It’s important to note that while TEK1 did not design the structure, their expertise in steel detailing significantly influenced the project’s success.
The collaborative efforts of our team, with TEK1 at the forefront of steel detailing, ensured the swift and successful completion of the project.

Author: Raj (Arokiaraj Arputharaj)
ALDI MERIMBULA features a versatile multipurpose hall structure, and TEK1, a dedicated steel detailer, played a pivotal role in its realization. Specializing in All Steels, TEK1 meticulously executed the installation of anchor bolt steel columns, beams, braces, and purlins.
As a steel detailer, TEK1 raised multiple Requests for Information (RFIs) along with corresponding proposals. These RFIs contributed to refining the project details, showcasing TEK1’s commitment to precision in steel detailing.
The client’s prompt response to TEK1’s RFIs facilitated effective communication and adjustments. It’s important to note that while TEK1 did not design the structure, their expertise in steel detailing significantly influenced the project’s success.
The collaborative efforts of our team, with TEK1 at the forefront of steel detailing, ensured the swift and successful completion of the project.

.

Raj (Arokiaraj Arputharaj)
St. Benedict’s Stage 7 Hall, Oran Park, is a multipurpose hall structure.
St. Benedict’s Catholic College was opened in 2011 on a greenfield site in Sydney’s south west suburb of Oran Park.
There are seven stages of construction work listed below.
TEK1’s scope was Muti-Porspose Hall, and works included anchorbolt steel columns, beams, braces, and purlins.
TEK1 raised multiple RFIs with a proposal. So the design got revised according to the RFIs.
The client responded to TEK1 RFIs quickly.
The project was completed quickly by our team.



Raj (Arokiaraj Arputharaj)
Bega Tafe-Stage 2 structure is Multi Trades Hub.
The new 2-level Multi Trades Hub adjoins the existing TAFE NSW Connected Learning Centre and incorporates workshops for automotive, engineering, carpentry, and bricklaying disciplines. Also included are general learning spaces, specialist facilities that support the delivery of aged care, disability courses, and early childcare, as well as a specialised outdoor area for horticulture.
TEK1 works included anchorbolt steel columns, beams, braces, and purlins.
TEK1 raised multiple RFIs with a proposal. So the design got revised according to the RFIs. The client responded to TEK1 RFIs quickly. The project was completed quickly by our team.










Raj (Arokiaraj Arputharaj)
4 Schofield Street is a multi-residential development structure.
The structure contained five dwellings. TEK1 raised multiple RFIs with a proposal. So the design got revised according to the RFIs.
The client responded to TEK1 RFIs quickly.
The project was completed quickly by our team.