Category: Steel Detailing Blog

This page show cases some of the Steel Detailing projectgs completed in Melbourne, Sydney, WA, Brisbane Tek1 has completed

  • Fort school Building-A & D

    Fort school Building-A & D

    About this project?

    Succesfully completed.
    Tight schedule.
    Lot of analyzing with existing steel and walls. No problems whatsoever.

    Isometric view of Fort school Building-A & D
    Isometric view of Fort school Building-A & D
    Main steel – Isometric view of Fort school Building-A & D
    Main steel – Plan view of Fort school Building-A & D

    Detailed by Vignesh & Shahul hameed

  • Lygon court plaza stair

    Lygon court plaza stair

    TEK1 finished this stair project. TEK1 not only model stairs as per design.We will check the stair design against the standards.

    We have checked this stair design against AS1428.

  • Erection Plan Set out Dimensioning

    Erection Plan Set out Dimensioning

    Today I had a site call about a set out dimension.

    Reason for call

    Dimension for set out from a Grid line outside the Building.

    AWNING SET OUT DIM
  • Tek1 – Tekla Tools

    Dimension Bolts

    Set up Instructions

    • Source code (sorry folks it’s a private repository).
    • Download program here.
    • Only works for: Tekla version: 19.1i
    • Run Installer.
    • SmartScreen may warn you about this program – by pass SmartScreen.

    Instructions:

    • Only dimensions horizontally and vertically. This means if you use some crazy views / angles it won’t work – and it will give the wrong dimensions.
    • You must select a window from within the view, or else it will crash.

    Trouble shooting: it doesn’t work!

    • Please check that “Toggle crossing selection” is on.
    • Allow “Select points”.

  • Millbrook Maintenance Stair

    Millbrook Maintenance Stair

    Author : Ramakrishnan. L

    TEK1 recently did the 5-different types of railway Maintenance stairs with varying chainage. We are using our own macros to Model & detail these stairs pretty easier.

    Please refer to below for few model snaps

  • Macquarie link bridge

    Macquarie link bridge

    TEK1 done a detailing work for the link bridge.The complication of this project is site measure. We have to co ordinate with the existing building site measure to finish this work.Most of the structural members are connected to the existing concrete.We have coordinated with site surveyor & got the dimension we want to connect the steel.

    TEK1 completed this job without any mess.We have provided a good info to fabricator as well as erector to finish this project smoothly.