It is important to check for fake dimensions before using it as reference model in Tekla
Please watch this video
Month: October 2018
-
Check for Fake dimensions in Autocad before using it as reference model
-
Connection Schedule – Read Loading conditions
Analyze load transfer before blindly applying connections.
Here is a markup from the engineer, which is right. The load from the UB350 beam is not transferred to SC7. Hence 4 bolts not required.
