3D-View of Oxford school3D-View of Oxford school3D-View of Oxford school – Only steelPlan layout of Oxford schoolPlan layout of Oxford school – Only steel
A new bridge on the Crescent right turn grade sepration over the Crescent and city west link at Lilyfield and Annandale at 4.6km west of Sydney Rozelle interchange and wester harbour tunnel is built for the NSW Government.
This bridge is more than 400m in length with approach & departure ramps. RHS (Rectangular Hollow Section) steel railings are provided on both sides of the bridge.
The barriers curve along the bridge and also the levels rise and fall as the bridge goes on. Two consecutive railings are connected together by a hollow connector. Refer to the images below.
3D-view of Reservoir school3D-view of Reservoir schoolPlan view of Reservoir school3D-View Steam building3D-View Main & Music building3D-View with misc item