  • Woolangbar service station

    Woolangbar service station

    This is a Woolangbar service station. TEK1 Successfully done this job by one time detailing without any hitch. Some of the Model Snaps
    Overall views
    Steel- 3D-view
    Overall layout (Plan view)
    Elevation view`
  • Watches of Switzerland – Renovation

    Watches of Switzerland – Renovation

    Author: Pon Dhileepan

    The Watches of Switzerland shop in Collin Street, Melbourne, has undergone a remarkable renovation, blending modern sophistication with heritage charm. A lift, 2 storey stair and frames for wall have been newly added.

    The lift runs from the ground floor to the second. Initially, the lift columns were designed for 10.8m. Since, this is an indoor construction, we raised query  about maneuvering the 10.8m columns inside & rotate them to their positions. Redesign happened & the columns were split to 4.5m max.

    The key responsibilities in this project are:

    • Coordination with the lift drawings
    • Marking and requesting essential site measurements through detailed sketches
    • The lift columns are bolted to the soffit of the roof slab. It s the responsibility of the modeller to alter the builder & ensure that there are no existing concrete beams at the vicinity of the lift columns.
    • Proposing structural member & their connections at areas that were missed out in the structural drawings.

    Refer to the attached model snaps below:

    Overall Renovation

    Lift

    Stair

    Wall Frame