Month: March 2024

  • Rozelle interchange – stairs

    Rozelle interchange – stairs

    Tek1 successfully completed a detailing work for stairs on the Rozelle Interchange & Western Harbour Tunnel project. Our scope of work encompassed providing stair steels and strategically placing holes for handrail posts, a task executed with precision and expertise.

    A crucial aspect of the project involved coordinating with the existing concrete area to ensure seamless integration and structural integrity of the stairs. This required extensive collaboration with our client, involving numerous meetings to synchronize efforts and address any challenges related to existing concrete and handrail post holes.

    Despite the complexities involved, Tek1 navigated the project without encountering any major obstacles, delivering exceptional results within the stipulated timeframe. Our meticulous attention to detail and proactive approach ensured that the project was completed seamlessly, exceeding expectations.

  • Standard Hooks and Cogs for Precast

    Standard Hooks and Cogs for Precast

    D500 N BAR
    dia d, (mm)
    Pin dia factor f,
    (Pin dia meter dp= fxd
    a
    180 deg hook
    b
    135 deg hook90 cog
    c
    104 for fitments100/105120140/155
    124 for fitments110/115130/145155/170
    164 for fitments / 5 dia 80120/130150/165185/205
    204 for fitments / 5 dia 80140/150200/220220/240
    244 for fitments / 5 dia 80170/180200/240265/290
    28
    32
    36
    40
  • Create Radius with Polygon Cut

    Create Radius with Polygon Cut

    Important points.

    Do not pick points along the Arch to do a polygon cut.

    Select Extreme end of the Arc and Create tangent to circle at those points.

    Use the intersection of the tangents as one polygon cut node.

    Other nodes should be outside the Arc.

    No node of the Polygon should be on the Arc.

    2 Nodes on the tangent outside the arc.

    1 Node on the Tangent intersction

    4th Node to close the polygon as needs to be.

    The video says any point on the arc. Any point will not do- extreme points of the arc is necessary

  • Proactive Solutions Save Time and Money at Surry Hills Village

    Proactive Solutions Save Time and Money at Surry Hills Village

    Tek1’s proactive approach played a pivotal role in saving time and money on site by effectively addressing challenges before they escalated. When detailing a stair in an already constructed building at Surry Hills Village, Tek1 requested site measurements and images of the existing structures. Analysing the received site images, Tek1 identified potential clashes, such as the extension of an existing beam conflicting with a new column and the roof of a nearby block encroaching on the new stair’s landing.

    With this foresight, Tek1 proposed the removal of the conflicting portions, mitigating potential disruptions to the workflow. By identifying and resolving these clashes early on, Tek1 ensured a smoother construction process, preventing costly delays and rework. This proactive approach not only saved valuable time but also optimized resources, demonstrating Tek1’s commitment to delivering efficient and cost-effective solutions to its clients.

  • GILGAI PROJECT

    GILGAI PROJECT

    Author: RAJ (Arokiaraj Arputharaj)

    • Dwelling-1 Inc Pergola
    • Dwelling-2 and Admin Inc Pergola
  • 414 CROWN STEET

    414 CROWN STEET

    Author: RAJ (Arokiaraj Arputharaj)

    • TYPE-A
    • TYPE-B
    • TYPE-C
    • TYPE-D
  • 29 HICKEYS RD, PENRITH

    29 HICKEYS RD, PENRITH

    Author: RAJ (Arokiaraj Arputharaj)

  • Cardinia Road, Pakenham

    Cardinia Road, Pakenham

    • Four signal platform structures along with their walkway steel structures.

    Below are the Site Erection photos of Signal Platform & Walkway.

    We’ve done a lot of work on pedestrian bridges, anti-throw screens, platforms, walkways and stairs. Check out our steel projects for more examples.