Month: April 2026
-

SHEDS | Class 9 Structures
Steel Detailing for Sheds
Expert Detailing for Class 9 Buildings , Sheds, Farm Sheds
We service Victoria, NSW, Brisbane, WA, NT, SA
-

SHED | DARETON NSW
-

Shed | Alice Springs
-

O & M Shed – Wunghnu Solar Farm
-
-

Steel Detaling | LA
Our Services for the City
The Standards we Follow Our Services Steel Detailing
Shop drawings to Steel Detailing | AISC | ASTMSteel Estimation
We build a tekla model from Structural drawings in Tekla
Produce the reports, give you the model and the reports with expert comments.Standards we follow Steel detailing AISC 360 (Specification for Structural Steel Buildings): The foundational standard for the design, fabrication, and erection of structural steel. ASTM Specifications: All materials must be identified and traceable to specific ASTM standards (e.g., A992 for wide flanges, A36 for plates). OSHA Standards We follow OSHA Standards -1926.754, 1926.755, 1926.756 -
Stair Construction
Steel or Timber Stair
You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.
Lot depends on what is the type of building, where is the stair, what is the asthetics required.
In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.
(more…)Steel or Timber Stair
You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.
Lot depends on what is the type of building, where is the stair, what is the asthetics required.
In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.
(more…)Steel or Timber Stair
You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.
Lot depends on what is the type of building, where is the stair, what is the asthetics required.
In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.
(more…)
Projects by Rama Krishan
-

The Importance of Adhering to Standards in Steel Detailing: A Case Study
-

Cardinia Road, Pakenham
-
Derrimut Bridge Pier Cladding
-

7-19 Glider’s way Steel & Precast Model
-

Project :OAKLEIGH RECREATION CENTRE – TEK1

Steel Detailing Projects | Melbourne | Sydney | WA
-

Always Check Beam Stock Lengths Before Detailing
-

TEK1’s Steel Detailing for Sydney Metro – Resolving Design Challenges – 6
-

Bathroom Pods — The Future of Modular Construction, Powered by LGS
-

Transforming Construction Efficiency with LGS Bathroom Pods

Staff Memos
-
Staff Memos
Read more: Staff Memos -
Memo 51: When recording a video and posting online, don’t forget to…
Read more: Memo 51: When recording a video and posting online, don’t forget to…Ideally we want to add on youtube AND vimeo. Sample Description below: Pon description Visit https://www.tek1.com.au/category/steel-detailing/ if you wish to learn more about steel detailing, and Tekla. Video by Dhileepan (senior team lead) and Dinesh. Visit https://www.tek1.com.au/author/pon_dhileepan/ for more details about my work. If you’re interested in Tek1 to do your steel detailing, please email:…
-
Memo 50: When coordinating with others, you have to charge; When the scope changes, your price need not change simply
Read more: Memo 50: When coordinating with others, you have to charge; When the scope changes, your price need not change simplyWhen coordinating with others, you have to charge; When the scope changes, you price need not change simply; (A) Prices need not be reduced by crossing out a line item Please see below: Hi Koshy, Sorry to do this, but we will need to remove line item 5 from the invoice. The structural steel components…
-
Memo 49: Context Switching – Projects Placed on Hold – Add an Invoice
Read more: Memo 49: Context Switching – Projects Placed on Hold – Add an InvoiceIf a project gets placed on hold, you should immediately invoice a pro-rata amount for the work that is completed. The costs of Picking up a project after forgetting it The Costs of Context Switching If a client demands that a project be completed NOW, then you have to stop what you are currently doing,…



