Month: April 2026

  • Steel Detaling | LA

    Steel Detaling | LA

    Shop drawings to Steel Detailing | AISC | ASTM

    The Grand LA

    Los Angles

    Our Services

    Expert Steel Detailing Services

    Our Services for the City

    The Standards we Follow
    Our ServicesSteel Detailing
    Shop drawings to Steel Detailing | AISC | ASTM
    Steel Estimation
    We build a tekla model from Structural drawings in Tekla
    Produce the reports, give you the model and the reports with expert comments.
    Standards we followSteel detailing AISC 360 (Specification for Structural Steel Buildings): The foundational standard for the design, fabrication, and erection of structural steel.
    ASTM Specifications: All materials must be identified and traceable to specific ASTM standards (e.g., A992 for wide flanges, A36 for plates).
    OSHA StandardsWe follow OSHA Standards -1926.754, 1926.755, 1926.756

    Interesting Steel Structures in Los Angeles

    Ribbon Of Light
    Ribbon of LIght

    Ribbon of Light

    650 S Clarence St, Los Angeles, CA 90033

  • Stair Construction

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)
  • Projects by Rama Krishan

    • Cloning of Assembly Drawings in Tekla

    • TRAFFICE BARRIER RAILING

    • Project :Audi Centre – Myaree

    • Steel Fabrication Drawing

    • How We are helping our Client Save $100,000s on the Iconic “EMU IN THE SKY” Project

  • Steel Detailing Projects | Melbourne | Sydney | WA

    Steel Detailing Projects | Melbourne | Sydney | WA

    • How to Overcome Transportation Limits in Large Truss Projects

    • Changing Vertical Leg Position for Easier Steel Erection

    • Media wall

    • Steel Finishes – what are they? Why should I care?

  • Staff Memos

    Staff Memos

    • Staff Memos

      Read more: Staff Memos
    • Memo 51: When recording a video and posting online, don’t forget to…

      Ideally we want to add on youtube AND vimeo. Sample Description below: Pon description Visit https://www.tek1.com.au/category/steel-detailing/ if you wish to learn more about steel detailing, and Tekla. Video by Dhileepan (senior team lead) and Dinesh. Visit https://www.tek1.com.au/author/pon_dhileepan/ for more details about my work. If you’re interested in Tek1 to do your steel detailing, please email:…

      Read more: Memo 51: When recording a video and posting online, don’t forget to…
    • Memo 50: When coordinating with others, you have to charge; When the scope changes, your price need not change simply

      When coordinating with others, you have to charge; When the scope changes, you price need not change simply; (A) Prices need not be reduced by crossing out a line item Please see below: Hi Koshy, Sorry to do this, but we will need to remove line item 5 from the invoice. The structural steel components…

      Read more: Memo 50: When coordinating with others, you have to charge; When the scope changes, your price need not change simply
    • Memo 49: Context Switching – Projects Placed on Hold – Add an Invoice

      If a project gets placed on hold, you should immediately invoice a pro-rata amount for the work that is completed. The costs of Picking up a project after forgetting it The Costs of Context Switching If a client demands that a project be completed NOW, then you have to stop what you are currently doing,…

      Read more: Memo 49: Context Switching – Projects Placed on Hold – Add an Invoice