Steel Detailing for Sheds
Expert Detailing for Class 9 Buildings , Sheds, Farm Sheds
We service Victoria, NSW, Brisbane, WA, NT, SA
-

SHED | DARETON NSW
-

Shed | Alice Springs
-

O & M Shed – Wunghnu Solar Farm

Expert Detailing for Class 9 Buildings , Sheds, Farm Sheds
We service Victoria, NSW, Brisbane, WA, NT, SA




| The Standards we Follow | |
| Our Services | Steel Detailing Shop drawings to Steel Detailing | AISC | ASTM |
| Steel Estimation We build a tekla model from Structural drawings in Tekla Produce the reports, give you the model and the reports with expert comments. | |
| Standards we follow | Steel detailing AISC 360 (Specification for Structural Steel Buildings): The foundational standard for the design, fabrication, and erection of structural steel. |
| ASTM Specifications: All materials must be identified and traceable to specific ASTM standards (e.g., A992 for wide flanges, A36 for plates). | |
| OSHA Standards | We follow OSHA Standards -1926.754, 1926.755, 1926.756 |
Lot depends on what is the type of building, where is the stair, what is the asthetics required.
In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.
(more…)Lot depends on what is the type of building, where is the stair, what is the asthetics required.
In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.
(more…)Lot depends on what is the type of building, where is the stair, what is the asthetics required.
In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.
(more…)










This memo clarifies the process for handling drawing approvals and issuance to ensure project coordination and minimize potential errors. Drawing Approval Reviews: When receiving approved drawings, carefully review them for any markups that may significantly impact other trades or existing structural elements (e.g., slabs, foundations, anchor bolts). Example: If an approved drawing introduces a slab…
What is the problem What is the process? Things may vary, depending on the job, but that’s it in a nuthsell. Check Payment terms before: Alert someone if you see that invoices have not been raised: But the Managing Director said: “we have been paid” therefore I sent the drawings: How do I check? Check…
I see this type of thing all too often from Tek1 staff – from both our offices: At Tek1, we believe in pushing the boundaries of conventional design to provide our clients with superior results. This project exemplifies our dedication to innovation and quality in every detail Cut it out. It’s nothing but BS /…
“In the world of steel detailing, failing to account for concrete variances can cost your client dearly. This case study from Duffy’s Forest serves as a vital reminder of why site surveys in steel detailing are non-negotiable. Without accurate site measurements, you risk massive on-site rectification costs—including crane hire and specialized labor crews—that can easily…