Author: admin

  • Foot Bridges | WalkWays | Pedestrian over passes

    • Foot Bridges | WalkWays | Pedestrian over passes

    • Warnambool Overpass | Steel Detailing

      Warrnambool Foot Bridge

  • Warrnambool Foot Bridge

    Warrnambool Foot Bridge

    Pedestrian overpass Foot Bridge steel drafting

    Warrnambool Pedestrian Over pass Lift   Structure

    Expert Steel Draftsman | Foot bridge | Pedestrian over pass | Walk Ways

  • Precast Blogs

    Precast Blogs

    • Chalet 1 – White Horse Village

      We are proud to showcase our contribution to Chalet 1 – White Horse Village, a unique and technically demanding project located in a mountainous region. This development presented several engineering and detailing challenges, and our team was honoured to be part of the solution — delivering precision, coordination, and innovation from start to finish. Technical…

    • PREFABRICATED CONCRETE ELEMENTS

      (Temporary Fixing Inserts for As-Cast Element Tolerances) INTRODUCTION: To ensure proper alignment and structural efficiency in the handling and installation of prefabricated concrete elements by placing temporary fixing inserts within the allowable as-cast dimensional tolerances as specified in Australian Standard AS 3850.2:2015. Inserts for the temporary attaching of prefabricated concrete elements shall be placed within…

    • STAGGERED FERRULES PLACEMENT ON PRECAST PANEL

      The design drawings for one of our Precast Project we were working on suggests ferrules must be placed staggered as noted below. The Problem: However, these casting components, such as ferrules cannot be placed on both sides of a precast panel with a thickness of less than 250mm. This mainly causes ferrules to clash along…

  • Mount Alvernia College

    Mount Alvernia College

    Steel Esto,atopm
    Expert Take Off Service from Tek1

    Mount Alvernia College

    Expert MTO. Fast. Low Cost call us on.

    Expert Material Takeoff and Steel Estimation Services

    Competitve pricing

    Tel: 0425791837

  • Navigate a million Changes?

    Navigate a million Changes?

    Meticulous Care – Expertise alone not sufficent

    Meticulous Care – Expertise alone not sufficent With many many changes, Mulitple site meaures, point cloud data, unless the processes are good and the care is meticulous, the knowledge and expertise will not count Street Address ATL Station State NSW Country Australia Modeler Ganesh Kumar

    When it comes to shop drawings and steel detailing, expertise, knowledge of software alone will not make it

    With many many changes, Mulitple site meaures, point cloud data, unless the processes are good and the care is meticulous, the knowledge and expertise will not count

  • .Net | Python Ruby on Rails

    • Copying From Object To Object – Tekla Open API (Code Snippets + Video)

      What is the task at hand? We want to make the Copy Object To Object command more efficient There is a nifty little command – little oft used in Tekla. The “Copy Object To Object” command. It’s handy, but it could be made better: all the model objects have to be selected individually. That can…

    • Dimensioning Bolts in a Tekla Drawing – Tekla Open API – (Demo + Code snippets)

      We want to create a little drawing plug-in What we want to do is to select and dimension all the bolts to a particular grid line. Here’s how it should work: * The user selects a group of bolts. * The user selects a gridline. * Dimensions are drawn from the Bolts to the Gridline.…

    • How to programmatically insert Reference Models into Tekla (Tekla Open API)

      Wouldn’t it be handy if we could programmatically insert reference models into Tekla? Well you can now do so quite easily. Here is the code which does the hard work. (You will of course add the appropriate references and directives): And if you want to see a video demonstration, here it is: Inserting XRefs into…

    • Finding Blocks “Colliding” with Shear Lig Points (AutoCAD .net, Precast – Bubble Deck)

      It’s a common problem apparently. There are far too many block references placed a little too close to those pesky shear lig points. It takes discipline, but when you have 5-10 people all working on the same drawing, with different practices, it’s something that’s really easy to miss, but really expensive to discover. So I…

    • How Tek1 solves the problem of Ordering Items in Precast Panel Detailing Projects (Precast)

      Counting Items is difficult Ordering parts in precast panel projects is tricky. You need a BOM (Bill of Materials). You need to know what you need and how much. When there are thousands upon thousands of parts – that can be a very tricky endeavour.  Why should you bother counting inventory? It all comes down…

  • Batch Edit a Part in Tekla Structures

    Batch Edit a Part in Tekla Structures

    TeklaStructures has a batch editing utility for Assemblies.

    However, if we have to batch edit parts there is nothing.

    Expert Steel Detailers demand Utilities

    Our detailers have demanded that we develop a utility to do batch editing of parts.

    (more…)
  • SHED | DARETON NSW

    SHED | DARETON NSW

    Darenton-NSW
    Darenton-NSW