Author: admin

  • Foot Bridges | WalkWays | Pedestrian over passes

    • Foot Bridges | WalkWays | Pedestrian over passes

    • Warnambool Overpass | Steel Detailing

      Warrnambool Foot Bridge

  • Warrnambool Foot Bridge

    Warrnambool Foot Bridge

    Pedestrian overpass Foot Bridge steel drafting

    Warrnambool Pedestrian Over pass Lift   Structure

    Expert Steel Draftsman | Foot bridge | Pedestrian over pass | Walk Ways

  • Precast Blogs

    Precast Blogs

    • Chalet 1 – White Horse Village

      We are proud to showcase our contribution to Chalet 1 – White Horse Village, a unique and technically demanding project located in a mountainous region. This development presented several engineering and detailing challenges, and our team was honoured to be part of the solution — delivering precision, coordination, and innovation from start to finish. Technical…

    • PREFABRICATED CONCRETE ELEMENTS

      (Temporary Fixing Inserts for As-Cast Element Tolerances) INTRODUCTION: To ensure proper alignment and structural efficiency in the handling and installation of prefabricated concrete elements by placing temporary fixing inserts within the allowable as-cast dimensional tolerances as specified in Australian Standard AS 3850.2:2015. Inserts for the temporary attaching of prefabricated concrete elements shall be placed within…

    • STAGGERED FERRULES PLACEMENT ON PRECAST PANEL

      The design drawings for one of our Precast Project we were working on suggests ferrules must be placed staggered as noted below. The Problem: However, these casting components, such as ferrules cannot be placed on both sides of a precast panel with a thickness of less than 250mm. This mainly causes ferrules to clash along…

  • Mount Alvernia College

    Mount Alvernia College

    Steel Esto,atopm
    Expert Take Off Service from Tek1

    Mount Alvernia College

    Expert MTO. Fast. Low Cost call us on.

    Expert Material Takeoff and Steel Estimation Services

    Competitve pricing

    Tel: 0425791837

  • Navigate a million Changes?

    Navigate a million Changes?

    Meticulous Care – Expertise alone not sufficent

    Meticulous Care – Expertise alone not sufficent With many many changes, Mulitple site meaures, point cloud data, unless the processes are good and the care is meticulous, the knowledge and expertise will not count Street Address ATL Station State NSW Country Australia Modeler Ganesh Kumar

    When it comes to shop drawings and steel detailing, expertise, knowledge of software alone will not make it

    With many many changes, Mulitple site meaures, point cloud data, unless the processes are good and the care is meticulous, the knowledge and expertise will not count

  • .Net | Python Ruby on Rails

    • Why do we set copy local to false?

      When you first get into .net API programming – for AutoCAD plugins, you learn this cardinal rule: make sure the three AutoCAD dlls you refer to have copy local set to false.   Why exactly is this the case? I couldn’t find a better answer than the one offered by Fenton Webb. Here it is…

    • Converting Engineering Components to Detailing Components

      What do we want to do? We have received a Tekla model from someone. The model we have received was built using an Engineering Modelling license. We have a full detailing license. There are components in this model, but we can’t number them because they were produced using an engineering license. If you want to…

    • Block Definitions and Block References Explained

      What is a block? What is a block reference? And what is the difference? Let’s use an analogy to help illustrate the concept. *Birth certificates are like your block table record, photocopies of your certificate are like block references.** (A) Block Definitions Imagine you have a really important document like your GREEN card/birth certificate etc.…

    • Tekla–AutoCAD: Interoperability Tool

      Tekla – AutoCAD Interoperability Tool Tekla licenses are pricey. About $30k + maintenance per license. That’s expensive. And if you had 10 licenses, or perhaps even 50 licenses, what if I told you that you needed: 30-50% less licenses than you currently hold? That’s a huge cost saving. If you only need 5 licenses, then…

    • Converting Engineering Components to Detailing Components (Tekla API)

      Has anyone every given you a  model created form an engineering license and asked you to produce shop drawings from it? Well that’s incredibly difficult to make possibly. Because you can’t easily number parts. So I created a macro which makes life much easier (and faster) too. Here is a demo of how it works:…

  • Batch Edit a Part in Tekla Structures

    Batch Edit a Part in Tekla Structures

    TeklaStructures has a batch editing utility for Assemblies.

    However, if we have to batch edit parts there is nothing.

    Expert Steel Detailers demand Utilities

    Our detailers have demanded that we develop a utility to do batch editing of parts.

    (more…)
  • SHED | DARETON NSW

    SHED | DARETON NSW

    Darenton-NSW
    Darenton-NSW