Author: admin

  • Foot Bridges | WalkWays | Pedestrian over passes

    • Foot Bridges | WalkWays | Pedestrian over passes

    • Warnambool Overpass | Steel Detailing

      Warrnambool Foot Bridge

  • Warrnambool Foot Bridge

    Warrnambool Foot Bridge

    Pedestrian overpass Foot Bridge steel drafting

    Warrnambool Pedestrian Over pass Lift   Structure

    Expert Steel Draftsman | Foot bridge | Pedestrian over pass | Walk Ways

  • Precast Blogs

    Precast Blogs

    • Chalet 1 – White Horse Village

      We are proud to showcase our contribution to Chalet 1 – White Horse Village, a unique and technically demanding project located in a mountainous region. This development presented several engineering and detailing challenges, and our team was honoured to be part of the solution — delivering precision, coordination, and innovation from start to finish. Technical…

    • PREFABRICATED CONCRETE ELEMENTS

      (Temporary Fixing Inserts for As-Cast Element Tolerances) INTRODUCTION: To ensure proper alignment and structural efficiency in the handling and installation of prefabricated concrete elements by placing temporary fixing inserts within the allowable as-cast dimensional tolerances as specified in Australian Standard AS 3850.2:2015. Inserts for the temporary attaching of prefabricated concrete elements shall be placed within…

    • STAGGERED FERRULES PLACEMENT ON PRECAST PANEL

      The design drawings for one of our Precast Project we were working on suggests ferrules must be placed staggered as noted below. The Problem: However, these casting components, such as ferrules cannot be placed on both sides of a precast panel with a thickness of less than 250mm. This mainly causes ferrules to clash along…

  • Mount Alvernia College

    Mount Alvernia College

    Steel Esto,atopm
    Expert Take Off Service from Tek1

    Mount Alvernia College

    Expert MTO. Fast. Low Cost call us on.

    Expert Material Takeoff and Steel Estimation Services

    Competitve pricing

    Tel: 0425791837

  • Navigate a million Changes?

    Navigate a million Changes?

    Meticulous Care – Expertise alone not sufficent

    Meticulous Care – Expertise alone not sufficent With many many changes, Mulitple site meaures, point cloud data, unless the processes are good and the care is meticulous, the knowledge and expertise will not count Street Address ATL Station State NSW Country Australia Modeler Ganesh Kumar

    When it comes to shop drawings and steel detailing, expertise, knowledge of software alone will not make it

    With many many changes, Mulitple site meaures, point cloud data, unless the processes are good and the care is meticulous, the knowledge and expertise will not count

  • .Net | Python Ruby on Rails

    • LineDirectionJigger (AutoCAD .net API Jig code)

      Many times, over my career in using AutoCAD, I’ve had this requirement: given a particular input vector, I’ve wanted to a jig a line perpendicular to it, within my code. Accordingly, I have written a little class which I call the LineDirectionJigger: basically it restricts users to select one direction or another. For the sake…

    • Precast Efficiency Tool: Efficiently Create Elevation Drawings

      Demo: Command: Marking Plan To Elevation from Tek1 on Vimeo. What does this command do? It quickly and easily allows you to create elevation drawings given a certain marking plan view of a panel. You need to first: (i) select the applicable panel lines, then (ii) you need to select a view direction. The way…

    • Check for Fake dimensions in Autocad before using it as reference model

      It is important to check for fake dimensions before using it as reference model in Tekla Please watch this video

    • Tekla Model Sharing

      Tekla has got model sharing with latest releases. However, nothing like that exists in previous releases. Now with API plugin from Tek1 you can share member placements on earlier versions. There is no Lic fees to for model sharing to be paid to Tekla. You as the main modeller decide to farm out member placements…

    • TeklaInterop Minimum checks

      Friends, there is no substitute to reading the documentation. The most up to date version of this is located in our Team Drive – but here is a local copy nonetheless. AutoCAD-Tekla-Interop-Documentation Following minimum checks should be carried out for interop The member-schedule CSV file has the all the layer names in the cad files…

  • Batch Edit a Part in Tekla Structures

    Batch Edit a Part in Tekla Structures

    TeklaStructures has a batch editing utility for Assemblies.

    However, if we have to batch edit parts there is nothing.

    Expert Steel Detailers demand Utilities

    Our detailers have demanded that we develop a utility to do batch editing of parts.

    (more…)
  • SHED | DARETON NSW

    SHED | DARETON NSW

    Darenton-NSW
    Darenton-NSW