Author: admin

  • Staff Memos

    Staff Memos

    • Staff Memo #16 – If a Client asks for you by name – Extra bonus will come your way

      If a client asks for a specific detailer to do his / her job, then you’re going to be getting a nice little bonus – more than the normal amount. Why should I care to get repeat work? This will encourage you to look after your clients, on all your jobs, and to get more…

      Read more: Staff Memo #16 – If a Client asks for you by name – Extra bonus will come your way
    • Tek1 Memo #15 – Documenting Variations

      Variation Documentation – Policy All changes / variations are to be logged as variations on the Quote App. No exceptions. You will get paid. You will help the client get paid. Most importantly: you are documenting risk / delays. Why must it go in the app? What if I don’t do it? Nobody gets paid:…

      Read more: Tek1 Memo #15 – Documenting Variations
    • Memo 14 – Private details (e.g. links) should be in the private section only

      Philosophy: make things AS EASY as possible for your clients, do not confuse them. If someone sends you a link, that you cannot access how would you respond? The solution? Add private links and other details in “private details” section. There will be no confusion for the client.

      Read more: Memo 14 – Private details (e.g. links) should be in the private section only
    • Memo 13 – How to Remind clients about variation approvals

      The Building industry in Australia is tough. The insolvency rate is over: 20%. Lies, non-paying etc. strikes, cost surges etc. is all de rigger. Builders are stressed. There’s no need to stress them out even more. Variation work is common the industry. Simply use the forms on our quote app – they are standard template…

      Read more: Memo 13 – How to Remind clients about variation approvals
  • Fast Track to a Tekla Career

    Fast Track to a Tekla Career

    Ready to trade that graduation cap for a career in 3D modeling?

    🎓🏗️ If you’re looking to break into the world of structural steel as a Tekla Detailer, we’ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys 🔑

    (more…)

    Ready to trade that graduation cap for a career in 3D modeling?

    🎓🏗️ If you’re looking to break into the world of structural steel as a Tekla Detailer, we’ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys 🔑

    (more…)

    Ready to trade that graduation cap for a career in 3D modeling?

    🎓🏗️ If you’re looking to break into the world of structural steel as a Tekla Detailer, we’ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys 🔑

    (more…)
  • Large Material Take Off

    Large Material Take Off

    McKillops Take Off

    A 240 ton Material take completed in a very short time, accurately modelled.

    Estimation Accuracy and Speed

    With tested a tried processes, Tek1 offers fast turn around and accurate take offs. Your Estimation time is cut by weeks.

  • Installing Moodle on Lightsail

    databasemysql (10.11.8-MariaDB-0ubuntu0.24.04.1)must be installed and enabledWrong $CFG->dbtype. You need to change it in your config.php file from ‘mysqli’ to ‘mariadb’
    site not httpsif this test fails, it indicates a potential problemIt has been detected that your site is not secured using HTTPS. It is strongly recommended to migrate your site to HTTPS for increased security and improved integration with other systems.
  • Adding Ferrule Bolt

    How to create a Ferrule Bolt and Use it.

    Steps Edit Bolt Catalogue. Add the Ferrule bolt in this case we are going start from BOLTFB1640 and create BOLTFB1655 Then we add a bolt Assembly catalog. Again we start from Bolt BOLTFB1640 and create BOLTFB1655 Then we use that in tekla to model the bolt. When you model the bolt make sure 1. No nut is used 2. Washer is on the head side. 3. Cut length is negative of the length you want. This decides the length of the bolt in report. Most important do not ignore — Take report and check.

  • Use Trimble Connect for Quick Checking

    Trimble Connect for Checking

    Upload the reference models when you upload the model to trimble connect.

    Now any one can make some quick checks.

    You can turn off/on the reference models for quick checks.

    May adjust the transparency too

    #Trimble Connect #Tekla

  • Emu in the sky goes live

    https://youtu.be/iJackq8YAEI

    Iconic project by Chess Engineering

    hess Engineering.

    Detailed expertly by Tek1 with the following scope

    1. The Structure
    2. The Architecturals – Extremely Complex.
    3. The lighting fixtures

    Tek1’s A team was proud to be involved.

    We have completed this project with NIL errors for detailing side. It went extremely well with Chess too.

    Chess too hadextremely low stuff ups (as reported) You can see the trimble connect model of the entire proejct at our blog post

    View the trimble connect model

  • Culvert Mould

    We were requested to develop a culvert mould for the precast manufacturere.

    Problems to Solve

    Culvert Mould
    • Reusable
    • Easy to de mould
    • No injury to personnel
    • Cheap.
    • Accuracy of final product.

    We have studied the requirements came up with a design. Submitted inital model with markups.

    Very few changes were done and the final design completed and shop drawings delivered.

    If you have any need for developing some tooling fixtures or anything which requires design, then Tek1 is the GOTO place.