Author: admin

  • Staff Memos

    Staff Memos

    • Adding details without approval which affects other trades

      This memo clarifies the process for handling drawing approvals and issuance to ensure project coordination and minimize potential errors. Drawing Approval Reviews: When receiving approved drawings, carefully review them for any markups that may significantly impact other trades or existing structural elements (e.g., slabs, foundations, anchor bolts). Example: If an approved drawing introduces a slab…

      Read more: Adding details without approval which affects other trades
    • Memo 43 – The Process of Invoicing – Check if Invoices have been raised

      What is the problem What is the process? Things may vary, depending on the job, but that’s it in a nuthsell. Check Payment terms before: Alert someone if you see that invoices have not been raised: But the Managing Director said: “we have been paid” therefore I sent the drawings: How do I check? Check…

      Read more: Memo 43 – The Process of Invoicing – Check if Invoices have been raised
    • Memo 43 – Cut the Crap from your marketing materials

      I see this type of thing all too often from Tek1 staff – from both our offices: At Tek1, we believe in pushing the boundaries of conventional design to provide our clients with superior results. This project exemplifies our dedication to innovation and quality in every detail Cut it out. It’s nothing but BS /…

      Read more: Memo 43 – Cut the Crap from your marketing materials
    • Concrete and Steel – Hidden Snags to Watch out For –A Case Study in Duffy’s Forrest – An Example of Something that can Kill your client

      “In the world of steel detailing, failing to account for concrete variances can cost your client dearly. This case study from Duffy’s Forest serves as a vital reminder of why site surveys in steel detailing are non-negotiable. Without accurate site measurements, you risk massive on-site rectification costs—including crane hire and specialized labor crews—that can easily…

      Read more: Concrete and Steel – Hidden Snags to Watch out For –A Case Study in Duffy’s Forrest – An Example of Something that can Kill your client
  • Fast Track to a Tekla Career

    Fast Track to a Tekla Career

    Ready to trade that graduation cap for a career in 3D modeling?

    🎓🏗️ If you’re looking to break into the world of structural steel as a Tekla Detailer, we’ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys 🔑

    (more…)

    Ready to trade that graduation cap for a career in 3D modeling?

    🎓🏗️ If you’re looking to break into the world of structural steel as a Tekla Detailer, we’ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys 🔑

    (more…)

    Ready to trade that graduation cap for a career in 3D modeling?

    🎓🏗️ If you’re looking to break into the world of structural steel as a Tekla Detailer, we’ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys 🔑

    (more…)
  • Large Material Take Off

    Large Material Take Off

    McKillops Take Off

    A 240 ton Material take completed in a very short time, accurately modelled.

    Estimation Accuracy and Speed

    With tested a tried processes, Tek1 offers fast turn around and accurate take offs. Your Estimation time is cut by weeks.

  • Installing Moodle on Lightsail

    databasemysql (10.11.8-MariaDB-0ubuntu0.24.04.1)must be installed and enabledWrong $CFG->dbtype. You need to change it in your config.php file from ‘mysqli’ to ‘mariadb’
    site not httpsif this test fails, it indicates a potential problemIt has been detected that your site is not secured using HTTPS. It is strongly recommended to migrate your site to HTTPS for increased security and improved integration with other systems.
  • Adding Ferrule Bolt

    How to create a Ferrule Bolt and Use it.

    Steps Edit Bolt Catalogue. Add the Ferrule bolt in this case we are going start from BOLTFB1640 and create BOLTFB1655 Then we add a bolt Assembly catalog. Again we start from Bolt BOLTFB1640 and create BOLTFB1655 Then we use that in tekla to model the bolt. When you model the bolt make sure 1. No nut is used 2. Washer is on the head side. 3. Cut length is negative of the length you want. This decides the length of the bolt in report. Most important do not ignore — Take report and check.

  • Use Trimble Connect for Quick Checking

    Trimble Connect for Checking

    Upload the reference models when you upload the model to trimble connect.

    Now any one can make some quick checks.

    You can turn off/on the reference models for quick checks.

    May adjust the transparency too

    #Trimble Connect #Tekla

  • Emu in the sky goes live

    https://youtu.be/iJackq8YAEI

    Iconic project by Chess Engineering

    hess Engineering.

    Detailed expertly by Tek1 with the following scope

    1. The Structure
    2. The Architecturals – Extremely Complex.
    3. The lighting fixtures

    Tek1’s A team was proud to be involved.

    We have completed this project with NIL errors for detailing side. It went extremely well with Chess too.

    Chess too hadextremely low stuff ups (as reported) You can see the trimble connect model of the entire proejct at our blog post

    View the trimble connect model

  • Culvert Mould

    We were requested to develop a culvert mould for the precast manufacturere.

    Problems to Solve

    Culvert Mould
    • Reusable
    • Easy to de mould
    • No injury to personnel
    • Cheap.
    • Accuracy of final product.

    We have studied the requirements came up with a design. Submitted inital model with markups.

    Very few changes were done and the final design completed and shop drawings delivered.

    If you have any need for developing some tooling fixtures or anything which requires design, then Tek1 is the GOTO place.