Author: admin

  • Staff Memos

    Staff Memos

    • Memo #23 – How to write blog posts

      I wish to move this firm towards a more decentralised model: where our success, your success, and your teamโ€™s success will ultimately be decided by the client. The client will be your God. Serve him well. Build your own brand! Going forward, you will be responsible for your own marketing, not myself. If you market…

      Read more: Memo #23 – How to write blog posts
    • Memo #22: How to update clients on quote requests

      It is a material advantage to quote early, and accurately. Clients will then have an option of: (a) committing early and locking in a quote, or (b) to continue searching. If you deliver a quote late, then you may lose the opportunity to secure an earlier tender – perhaps someone who did quote early, won…

      Read more: Memo #22: How to update clients on quote requests
    • Memo #21 – DWG to be included with PDFs for drilling, column, erection layouts

      For “Structural Steel Shop Drawings”, This is a client requirement. The clients would like to have the “steel erection drawings” in DWG format as well. Why do they need them? Surveyors require the DWG format for the erection drawings because they use them to mark the locations for anchors and determine the precise placement of…

      Read more: Memo #21 – DWG to be included with PDFs for drilling, column, erection layouts
    • Memo #20 – A Stable Foundation

      Most things worth doing take time. It takes investment, and patience, and hard work. Things don’t come from thin-air, like magic. It is much the same when building a firm: it takes time. I will document in which direction I intend to push this firm re:remuneration model, and why our remuneration model is superior to…

      Read more: Memo #20 – A Stable Foundation
  • Fast Track to a Tekla Career

    Fast Track to a Tekla Career

    Ready to trade that graduation cap for a career in 3D modeling?

    ๐ŸŽ“๐Ÿ—๏ธ If youโ€™re looking to break into the world of structural steel as a Tekla Detailer, weโ€™ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys ๐Ÿ”‘

    (more…)

    Ready to trade that graduation cap for a career in 3D modeling?

    ๐ŸŽ“๐Ÿ—๏ธ If youโ€™re looking to break into the world of structural steel as a Tekla Detailer, weโ€™ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys ๐Ÿ”‘

    (more…)

    Ready to trade that graduation cap for a career in 3D modeling?

    ๐ŸŽ“๐Ÿ—๏ธ If youโ€™re looking to break into the world of structural steel as a Tekla Detailer, weโ€™ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys ๐Ÿ”‘

    (more…)
  • Large Material Take Off

    Large Material Take Off

    McKillops Take Off

    A 240 ton Material take completed in a very short time, accurately modelled.

    Estimation Accuracy and Speed

    With tested a tried processes, Tek1 offers fast turn around and accurate take offs. Your Estimation time is cut by weeks.

  • Installing Moodle on Lightsail

    databasemysql (10.11.8-MariaDB-0ubuntu0.24.04.1)must be installed and enabledWrong $CFG->dbtype. You need to change it in your config.php file from ‘mysqli’ to ‘mariadb’
    site not httpsif this test fails, it indicates a potential problemIt has been detected that your site is not secured using HTTPS. It is strongly recommended to migrate your site to HTTPS for increased security and improved integration with other systems.
  • Adding Ferrule Bolt

    How to create a Ferrule Bolt and Use it.

    Steps Edit Bolt Catalogue. Add the Ferrule bolt in this case we are going start from BOLTFB1640 and create BOLTFB1655 Then we add a bolt Assembly catalog. Again we start from Bolt BOLTFB1640 and create BOLTFB1655 Then we use that in tekla to model the bolt. When you model the bolt make sure 1. No nut is used 2. Washer is on the head side. 3. Cut length is negative of the length you want. This decides the length of the bolt in report. Most important do not ignore — Take report and check.

  • Use Trimble Connect for Quick Checking

    Trimble Connect for Checking

    Upload the reference models when you upload the model to trimble connect.

    Now any one can make some quick checks.

    You can turn off/on the reference models for quick checks.

    May adjust the transparency too

    #Trimble Connect #Tekla

  • Emu in the sky goes live

    https://youtu.be/iJackq8YAEI

    Iconic project by Chess Engineering

    hess Engineering.

    Detailed expertly by Tek1 with the following scope

    1. The Structure
    2. The Architecturals – Extremely Complex.
    3. The lighting fixtures

    Tek1’s A team was proud to be involved.

    We have completed this project with NIL errors for detailing side. It went extremely well with Chess too.

    Chess too hadextremely low stuff ups (as reported) You can see the trimble connect model of the entire proejct at our blog post

    View the trimble connect model

  • Culvert Mould

    We were requested to develop a culvert mould for the precast manufacturere.

    Problems to Solve

    Culvert Mould
    • Reusable
    • Easy to de mould
    • No injury to personnel
    • Cheap.
    • Accuracy of final product.

    We have studied the requirements came up with a design. Submitted inital model with markups.

    Very few changes were done and the final design completed and shop drawings delivered.

    If you have any need for developing some tooling fixtures or anything which requires design, then Tek1 is the GOTO place.