Author: admin

  • Steel Detaling | LA

    Steel Detaling | LA

    Shop drawings to Steel Detailing | AISC | ASTM

    The Grand LA

    Los Angles

    Our Services

    Expert Steel Detailing Services

    Our Services for the City

    The Standards we Follow
    Our ServicesSteel Detailing
    Shop drawings to Steel Detailing | AISC | ASTM
    Steel Estimation
    We build a tekla model from Structural drawings in Tekla
    Produce the reports, give you the model and the reports with expert comments.
    Standards we followSteel detailing AISC 360 (Specification for Structural Steel Buildings): The foundational standard for the design, fabrication, and erection of structural steel.
    ASTM Specifications: All materials must be identified and traceable to specific ASTM standards (e.g., A992 for wide flanges, A36 for plates).
    OSHA StandardsWe follow OSHA Standards -1926.754, 1926.755, 1926.756

    Interesting Steel Structures in Los Angeles

    Ribbon Of Light
    Ribbon of LIght

    Ribbon of Light

    650 S Clarence St, Los Angeles, CA 90033

  • Stair Construction

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)
  • Hand Logistics | Laverton | Steel Estimation

    Hand Logistics | Laverton | Steel Estimation

    Hawk Logistics Laverton | Steel Estimation
    Hawk Logistics Laverton

    Expert Steel Take Off for approx 100 tons

    Read more: Hand Logistics | Laverton | Steel Estimation

    This where you provide details of your project. Use good english. The best way is to dictate in tamil and and ask google to translate, instead of writing some bad engilish and asking AI to fix the English

  • Projects by Rama Krishan

    • The Importance of Adhering to Standards in Steel Detailing: A Case Study

    • Cardinia Road, Pakenham

    • Derrimut Bridge Pier Cladding

    • 7-19 Glider’s way Steel & Precast Model

    • Project :OAKLEIGH RECREATION CENTRE – TEK1

  • Steel Detailing Projects | Melbourne | Sydney | WA

    Steel Detailing Projects | Melbourne | Sydney | WA

    • Memo 51: When recording a video and posting online, don’t forget to…

    • TEK1’s Steel Detailing for Sydney Metro – Resolving Design Challenges – 7

    • Always Check Beam Stock Lengths Before Detailing

    • TEK1’s Steel Detailing for Sydney Metro – Resolving Design Challenges – 6

  • Staff Memos

    Staff Memos

    • Staff Memo – Webmail Login

      Please use the following link to login to your tek1 engineering services mail: https://gvam1290.siteground.biz/webmail/mail/

      Read more: Staff Memo – Webmail Login
    • Adding details without approval which affects other trades

      This memo clarifies the process for handling drawing approvals and issuance to ensure project coordination and minimize potential errors. Drawing Approval Reviews: When receiving approved drawings, carefully review them for any markups that may significantly impact other trades or existing structural elements (e.g., slabs, foundations, anchor bolts). Example: If an approved drawing introduces a slab…

      Read more: Adding details without approval which affects other trades
    • Memo 43 – The Process of Invoicing – Check if Invoices have been raised

      What is the problem What is the process? Things may vary, depending on the job, but that’s it in a nuthsell. Check Payment terms before: Alert someone if you see that invoices have not been raised: But the Managing Director said: “we have been paid” therefore I sent the drawings: How do I check? Check…

      Read more: Memo 43 – The Process of Invoicing – Check if Invoices have been raised
    • Memo 43 – Cut the Crap from your marketing materials

      I see this type of thing all too often from Tek1 staff – from both our offices: At Tek1, we believe in pushing the boundaries of conventional design to provide our clients with superior results. This project exemplifies our dedication to innovation and quality in every detail Cut it out. It’s nothing but BS /…

      Read more: Memo 43 – Cut the Crap from your marketing materials
  • Fast Track to a Tekla Career

    Fast Track to a Tekla Career

    Ready to trade that graduation cap for a career in 3D modeling?

    🎓🏗️ If you’re looking to break into the world of structural steel as a Tekla Detailer, we’ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys 🔑

    (more…)

    Ready to trade that graduation cap for a career in 3D modeling?

    🎓🏗️ If you’re looking to break into the world of structural steel as a Tekla Detailer, we’ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys 🔑

    (more…)

    Ready to trade that graduation cap for a career in 3D modeling?

    🎓🏗️ If you’re looking to break into the world of structural steel as a Tekla Detailer, we’ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys 🔑

    (more…)
  • Large Material Take Off

    Large Material Take Off

    McKillops Take Off

    A 240 ton Material take completed in a very short time, accurately modelled.

    Estimation Accuracy and Speed

    With tested a tried processes, Tek1 offers fast turn around and accurate take offs. Your Estimation time is cut by weeks.

  • Installing Moodle on Lightsail

    databasemysql (10.11.8-MariaDB-0ubuntu0.24.04.1)must be installed and enabledWrong $CFG->dbtype. You need to change it in your config.php file from ‘mysqli’ to ‘mariadb’
    site not httpsif this test fails, it indicates a potential problemIt has been detected that your site is not secured using HTTPS. It is strongly recommended to migrate your site to HTTPS for increased security and improved integration with other systems.