Author: admin

  • Stair Construction

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)
  • Hand Logistics | Laverton | Steel Estimation

    Hand Logistics | Laverton | Steel Estimation

    Hawk Logistics Laverton | Steel Estimation
    Hawk Logistics Laverton

    Expert Steel Take Off for approx 100 tons

    Read more: Hand Logistics | Laverton | Steel Estimation

    This where you provide details of your project. Use good english. The best way is to dictate in tamil and and ask google to translate, instead of writing some bad engilish and asking AI to fix the English

  • Projects by Rama Krishan

    • Cloning of Assembly Drawings in Tekla

    • TRAFFICE BARRIER RAILING

    • Project :Audi Centre – Myaree

    • Steel Fabrication Drawing

    • How We are helping our Client Save $100,000s on the Iconic “EMU IN THE SKY” Project

  • Steel Detailing Projects | Melbourne | Sydney | WA

    Steel Detailing Projects | Melbourne | Sydney | WA

    • The Grand LA

      Steel Detaling | LA

    • Sydeny Fabricators trust in Tek1

      Steel Detailing Projects | Melbourne | Sydney | WA

    • TEK1โ€™s Steel Detailing for Sydney Metro โ€“ Resolving Design Challenges โ€“ 8

    • Cloning of Assembly Drawings in Tekla

  • Staff Memos

    Staff Memos

    • Staff Memo – Webmail Login

      Please use the following link to login to your tek1 engineering services mail: https://gvam1290.siteground.biz/webmail/mail/

      Read more: Staff Memo – Webmail Login
    • Adding details without approval which affects other trades

      This memo clarifies the process for handling drawing approvals and issuance to ensure project coordination and minimize potential errors. Drawing Approval Reviews: When receiving approved drawings, carefully review them for any markups that may significantly impact other trades or existing structural elements (e.g., slabs, foundations, anchor bolts). Example: If an approved drawing introduces a slab…

      Read more: Adding details without approval which affects other trades
    • Memo 43 – The Process of Invoicing – Check if Invoices have been raised

      What is the problem What is the process? Things may vary, depending on the job, but thatโ€™s it in a nuthsell. Check Payment terms before: Alert someone if you see that invoices have not been raised: But the Managing Director said: “we have been paid” therefore I sent the drawings: How do I check? Check…

      Read more: Memo 43 – The Process of Invoicing – Check if Invoices have been raised
    • Memo 43 – Cut the Crap from your marketing materials

      I see this type of thing all too often from Tek1 staff – from both our offices: At Tek1, we believe in pushing the boundaries of conventional design to provide our clients with superior results. This project exemplifies our dedication to innovation and quality in every detail Cut it out. It’s nothing but BS /…

      Read more: Memo 43 – Cut the Crap from your marketing materials
  • Fast Track to a Tekla Career

    Fast Track to a Tekla Career

    Ready to trade that graduation cap for a career in 3D modeling?

    ๐ŸŽ“๐Ÿ—๏ธ If youโ€™re looking to break into the world of structural steel as a Tekla Detailer, weโ€™ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys ๐Ÿ”‘

    (more…)

    Ready to trade that graduation cap for a career in 3D modeling?

    ๐ŸŽ“๐Ÿ—๏ธ If youโ€™re looking to break into the world of structural steel as a Tekla Detailer, weโ€™ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys ๐Ÿ”‘

    (more…)

    Ready to trade that graduation cap for a career in 3D modeling?

    ๐ŸŽ“๐Ÿ—๏ธ If youโ€™re looking to break into the world of structural steel as a Tekla Detailer, weโ€™ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys ๐Ÿ”‘

    (more…)
  • Large Material Take Off

    Large Material Take Off

    McKillops Take Off

    A 240 ton Material take completed in a very short time, accurately modelled.

    Estimation Accuracy and Speed

    With tested a tried processes, Tek1 offers fast turn around and accurate take offs. Your Estimation time is cut by weeks.

  • Installing Moodle on Lightsail

    databasemysql (10.11.8-MariaDB-0ubuntu0.24.04.1)must be installed and enabledWrong $CFG->dbtype. You need to change it in your config.php file from ‘mysqli’ to ‘mariadb’
    site not httpsif this test fails, it indicates a potential problemIt has been detected that your site is not secured using HTTPS. It is strongly recommended to migrate your site to HTTPS for increased security and improved integration with other systems.
  • Adding Ferrule Bolt

    How to create a Ferrule Bolt and Use it.

    Steps Edit Bolt Catalogue. Add the Ferrule bolt in this case we are going start from BOLTFB1640 and create BOLTFB1655 Then we add a bolt Assembly catalog. Again we start from Bolt BOLTFB1640 and create BOLTFB1655 Then we use that in tekla to model the bolt. When you model the bolt make sure 1. No nut is used 2. Washer is on the head side. 3. Cut length is negative of the length you want. This decides the length of the bolt in report. Most important do not ignore — Take report and check.