Author: admin

  • Stair Construction

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)
  • Hand Logistics | Laverton | Steel Estimation

    Hand Logistics | Laverton | Steel Estimation

    Hawk Logistics Laverton | Steel Estimation
    Hawk Logistics Laverton

    Expert Steel Take Off for approx 100 tons

    Read more: Hand Logistics | Laverton | Steel Estimation

    This where you provide details of your project. Use good english. The best way is to dictate in tamil and and ask google to translate, instead of writing some bad engilish and asking AI to fix the English

  • Projects by Rama Krishan

    • Steel Detailing |VIC|AUS|

      Kimberly Estate Bridge

    • Cloning of Assembly Drawings in Tekla

    • TRAFFICE BARRIER RAILING

    • Project :Audi Centre – Myaree

    • Steel Fabrication Drawing

  • Steel Detailing Projects | Melbourne | Sydney | WA

    Steel Detailing Projects | Melbourne | Sydney | WA

    • Shop Drawing | OTE | St Marys Station | Sydney

      Navigate a million Changes?

    • The Grand LA

      Steel Detaling | LA

    • Sydeny Fabricators trust in Tek1

      Steel Detailing Projects | Melbourne | Sydney | WA

    • TEK1’s Steel Detailing for Sydney Metro – Resolving Design Challenges – 8

  • Staff Memos

    Staff Memos

    • Memo 26 – Tek1 must be on all drawings henceforth

      Please ensure that the firm’s name is on the Title Sheet. See details below. Drawings should not be sent without our firm’s name on it. NO EXCPETIONS. I will hold to account anyone who ignores or violates this memo. Why? We want to maintain and preserve our reputation. We want to promote our name: to…

      Read more: Memo 26 – Tek1 must be on all drawings henceforth
    • Staff Memo #25: How to add Live Links to Model Sharing Services

      Staff, please add live links to model sharing services. You can do so from the quote page directly. Just edit and add the link.           The links will be available to all clients on: (i) status emails, and (ii) on the status webpage as well.  

      Read more: Staff Memo #25: How to add Live Links to Model Sharing Services
    • Staff Memos: Long Term Goals

      I have not been clear in specifying overall objectives. I want to dramatically increase the reputation of our firm, to boost your remuneration, and to expand our offering(s). This is the plan: 1. Satisfy the Client The client pays the bills. In order to satisfy our clients, we must first understand our clients. When we…

      Read more: Staff Memos: Long Term Goals
    • Memo #23 – How to write blog posts

      I wish to move this firm towards a more decentralised model: where our success, your success, and your team’s success will ultimately be decided by the client. The client will be your God. Serve him well. Build your own brand! Going forward, you will be responsible for your own marketing, not myself. If you market…

      Read more: Memo #23 – How to write blog posts
  • Fast Track to a Tekla Career

    Fast Track to a Tekla Career

    Ready to trade that graduation cap for a career in 3D modeling?

    🎓🏗️ If you’re looking to break into the world of structural steel as a Tekla Detailer, we’ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys 🔑

    (more…)

    Ready to trade that graduation cap for a career in 3D modeling?

    🎓🏗️ If you’re looking to break into the world of structural steel as a Tekla Detailer, we’ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys 🔑

    (more…)

    Ready to trade that graduation cap for a career in 3D modeling?

    🎓🏗️ If you’re looking to break into the world of structural steel as a Tekla Detailer, we’ve got the ultimate “cheat code” to get you hired

    Here is your step-by-step roadmap to joining the Tek1 team:

    Get the Keys 🔑

    (more…)
  • Large Material Take Off

    Large Material Take Off

    McKillops Take Off

    A 240 ton Material take completed in a very short time, accurately modelled.

    Estimation Accuracy and Speed

    With tested a tried processes, Tek1 offers fast turn around and accurate take offs. Your Estimation time is cut by weeks.

  • Installing Moodle on Lightsail

    databasemysql (10.11.8-MariaDB-0ubuntu0.24.04.1)must be installed and enabledWrong $CFG->dbtype. You need to change it in your config.php file from ‘mysqli’ to ‘mariadb’
    site not httpsif this test fails, it indicates a potential problemIt has been detected that your site is not secured using HTTPS. It is strongly recommended to migrate your site to HTTPS for increased security and improved integration with other systems.
  • Adding Ferrule Bolt

    How to create a Ferrule Bolt and Use it.

    Steps Edit Bolt Catalogue. Add the Ferrule bolt in this case we are going start from BOLTFB1640 and create BOLTFB1655 Then we add a bolt Assembly catalog. Again we start from Bolt BOLTFB1640 and create BOLTFB1655 Then we use that in tekla to model the bolt. When you model the bolt make sure 1. No nut is used 2. Washer is on the head side. 3. Cut length is negative of the length you want. This decides the length of the bolt in report. Most important do not ignore — Take report and check.