-
Batch Edit a Part in Tekla Structures
TeklaStructures has a batch editing utility for Assemblies. However, if we have to batch edit parts there is nothing. Expert Steel Detailers demand Utilities Our detailers have demanded that we develop a utility to do batch editing of parts. Tekla API to the rescue The plugin was created with dot net api. FAQ Is this…
-
How to do some simple projections via AutoCAD’s .net API
Shows how to conduct a basic projection using AutoCAD’s .net API
-
How to create a rotated dimension (Tutorial) – AutoCAD .NET API
-
Tekla Open API: How to access a Tekla Model Object from the Equivalent Object in a Drawing?
The trick is to use to the drawing’s “PartIdentifier” to select the relevant object in the model space. Once you’ve done that, you can query the model object for whatever you want. Here is a code sample I’ve extracted from one of our Tekla API Applications. The basic steps: SinglePartDrawing singlePartDrawing = (SinglePartDrawing)drawing;Tekla.Structures.Model.ModelObject modelObject =…
-
QR Code on Drawings
We are now placing smart QR codes on drawings. Why? What benefit is accrued by doing so? Instructions on how to make it work Rules – To prevent obsolete data from being used or shown Updating the Drawings: Setting up the template
Category: blogs
Blogs By Tek1 on Steel detailing, Precast Panel Detailing, Stairs, Projects,
-
.Net | Python Ruby on Rails
-

Steel Stairs | Melbourne | Sydney | WA
-
Stair Construction
Read More: Stair Construction -

Dont Run Upstairs for missing dimension
Read More: Dont Run Upstairs for missing dimension -

MARYMEDE CATHOLIC COLLEGE – PLANTER BOX & STAIR
Read More: MARYMEDE CATHOLIC COLLEGE – PLANTER BOX & STAIR -

Mezzanine floor & stair handrails
Read More: Mezzanine floor & stair handrails -

Spotting the Hidden Error in an “Approved” Stair Project
Read More: Spotting the Hidden Error in an “Approved” Stair Project -
Plate Stringer Sprial Stair
Read More: Plate Stringer Sprial Stair -

Maclean Water Reservoir Stairs
Read More: Maclean Water Reservoir Stairs -

Addressing Stair Landing Slopes with Steel Modifications
Read More: Addressing Stair Landing Slopes with Steel Modifications -

Decjuba stair balustrade
Read More: Decjuba stair balustrade
-
-

Steel Detaling | LA
Our Services for the City
The Standards we Follow Our Services Steel Detailing
Shop drawings to Steel Detailing | AISC | ASTMSteel Estimation
We build a tekla model from Structural drawings in Tekla
Produce the reports, give you the model and the reports with expert comments.Standards we follow Steel detailing AISC 360 (Specification for Structural Steel Buildings): The foundational standard for the design, fabrication, and erection of structural steel. ASTM Specifications: All materials must be identified and traceable to specific ASTM standards (e.g., A992 for wide flanges, A36 for plates). OSHA Standards We follow OSHA Standards -1926.754, 1926.755, 1926.756 -

Staff Memos
-
Staff Memos
Read more: Staff Memos -
Memo 51: When recording a video and posting online, don’t forget to…
Read more: Memo 51: When recording a video and posting online, don’t forget to…Ideally we want to add on youtube AND vimeo. Sample Description below: Pon description Visit https://www.tek1.com.au/category/steel-detailing/ if you wish to learn more about steel detailing, and Tekla. Video by Dhileepan (senior team lead) and Dinesh. Visit https://www.tek1.com.au/author/pon_dhileepan/ for more details about my work. If you’re interested in Tek1 to do your steel detailing, please email:…
-
Memo 50: When coordinating with others, you have to charge; When the scope changes, your price need not change simply
Read more: Memo 50: When coordinating with others, you have to charge; When the scope changes, your price need not change simplyWhen coordinating with others, you have to charge; When the scope changes, you price need not change simply; (A) Prices need not be reduced by crossing out a line item Please see below: Hi Koshy, Sorry to do this, but we will need to remove line item 5 from the invoice. The structural steel components…
-
Memo 49: Context Switching – Projects Placed on Hold – Add an Invoice
Read more: Memo 49: Context Switching – Projects Placed on Hold – Add an InvoiceIf a project gets placed on hold, you should immediately invoice a pro-rata amount for the work that is completed. The costs of Picking up a project after forgetting it The Costs of Context Switching If a client demands that a project be completed NOW, then you have to stop what you are currently doing,…
-




