Category: blogs

Blogs By Tek1 on Steel detailing, Precast Panel Detailing, Stairs, Projects,

  • .Net | Python Ruby on Rails

    • Batch Edit a Part in Tekla Structures

      TeklaStructures has a batch editing utility for Assemblies. However, if we have to batch edit parts there is nothing. Expert Steel Detailers demand Utilities Our detailers have demanded that we develop a utility to do batch editing of parts. Tekla API to the rescue The plugin was created with dot net api. FAQ Is this…

    • How to do some simple projections via AutoCAD’s .net API

      Shows how to conduct a basic projection using AutoCAD’s .net API

    • How to create a rotated dimension (Tutorial) – AutoCAD .NET API

    • Tekla Open API: How to access a Tekla Model Object from the Equivalent Object in a Drawing?

      The trick is to use to the drawing’s “PartIdentifier” to select the relevant object in the model space. Once you’ve done that, you can query the model object for whatever you want. Here is a code sample I’ve extracted from one of our Tekla API Applications. The basic steps: SinglePartDrawing singlePartDrawing = (SinglePartDrawing)drawing;Tekla.Structures.Model.ModelObject modelObject =…

    • QR Code on Drawings

      We are now placing smart QR codes on drawings. Why? What benefit is accrued by doing so? Instructions on how to make it work Rules – To prevent obsolete data from being used or shown Updating the Drawings: Setting up the template

  • Steel Stairs | Melbourne | Sydney | WA

    Steel Stairs | Melbourne | Sydney | WA

  • SHED | DARETON NSW

    SHED | DARETON NSW

    Darenton-NSW
    Darenton-NSW

  • Steel Detaling | LA

    Steel Detaling | LA

    Shop drawings to Steel Detailing | AISC | ASTM

    The Grand LA

    Los Angles

    Our Services

    Expert Steel Detailing Services

    Our Services for the City

    The Standards we Follow
    Our ServicesSteel Detailing
    Shop drawings to Steel Detailing | AISC | ASTM
    Steel Estimation
    We build a tekla model from Structural drawings in Tekla
    Produce the reports, give you the model and the reports with expert comments.
    Standards we followSteel detailing AISC 360 (Specification for Structural Steel Buildings): The foundational standard for the design, fabrication, and erection of structural steel.
    ASTM Specifications: All materials must be identified and traceable to specific ASTM standards (e.g., A992 for wide flanges, A36 for plates).
    OSHA StandardsWe follow OSHA Standards -1926.754, 1926.755, 1926.756

    Interesting Steel Structures in Los Angeles

    Ribbon Of Light
    Ribbon of LIght

    Ribbon of Light

    650 S Clarence St, Los Angeles, CA 90033

  • Staff Memos

    Staff Memos

    • Staff Memos

      Read more: Staff Memos
    • Memo 51: When recording a video and posting online, don’t forget to…

      Ideally we want to add on youtube AND vimeo. Sample Description below: Pon description Visit https://www.tek1.com.au/category/steel-detailing/ if you wish to learn more about steel detailing, and Tekla. Video by Dhileepan (senior team lead) and Dinesh. Visit https://www.tek1.com.au/author/pon_dhileepan/ for more details about my work. If you’re interested in Tek1 to do your steel detailing, please email:…

      Read more: Memo 51: When recording a video and posting online, don’t forget to…
    • Memo 50: When coordinating with others, you have to charge; When the scope changes, your price need not change simply

      When coordinating with others, you have to charge; When the scope changes, you price need not change simply; (A) Prices need not be reduced by crossing out a line item Please see below: Hi Koshy, Sorry to do this, but we will need to remove line item 5 from the invoice. The structural steel components…

      Read more: Memo 50: When coordinating with others, you have to charge; When the scope changes, your price need not change simply
    • Memo 49: Context Switching – Projects Placed on Hold – Add an Invoice

      If a project gets placed on hold, you should immediately invoice a pro-rata amount for the work that is completed. The costs of Picking up a project after forgetting it The Costs of Context Switching If a client demands that a project be completed NOW, then you have to stop what you are currently doing,…

      Read more: Memo 49: Context Switching – Projects Placed on Hold – Add an Invoice