
Project Name
Project description
Our Services for the City
| The Standards we Follow | AS4100 AS 1428 AS1657 |
| Our Services | Steel Detailing, Precast Panel Detailing |
Blogs By Tek1 on Steel detailing, Precast Panel Detailing, Stairs, Projects,


You have a profile e.g. “CC200755.0″ obtained via the Tekla API. How can you extract it’s HEIGHT or WIDTH or other parameters (or properties) such as density? The Tekla Documentation is not good on this point, and it took me some time to find this out. I have documented the methodology, so hopefully that will save you some time.
In our use case, users select a profile via text (or rather via a CLI). How we need to build a shed from it. In order to build that shed, we need to know the specific properties of the profile that is selected. How do you do that via the Tekla Open API?
public double getHeight(string profileString)
{
LibraryProfileItem libraryProfileItem = new LibraryProfileItem();
libraryProfileItem.Select(profileString);
List<ProfileItemParameter> parameters = libraryProfileItem.aProfileItemParameters.Cast<ProfileItemParameter>().ToList();
double height = parameters.First(p => p.Property.ToUpper() == "HEIGHT").Value;
return height;
}
If you need some further explanation on what this all means, check out the video explanation below:
For more information our Tekla’s API’s feel free to check out our Tekla API blog.

We are now placing smart QR codes on drawings. Why? What benefit is accrued by doing so? Instructions on how to make it work Rules – To prevent obsolete data from being used or shown Updating the Drawings: Setting up the template
Do you loose time with missing dimensions Have you ever used the wrong revision? Here is what is cooking at Tek1. If you would lik to to know more Here is a solution where you can scan the QR code and bring up the assembly model. know the revision number of the drawing which you…
This is probably first precast project we have attempted with tekla structures as the tool. We have done a few with Revit, and lot with Autocad. There is raging argument with no one really know (unless one has walked in the weeds) which is a better tool I believe no tool as out of the…
If you want to waste time on a poorly documented API (which doesn’t make any sense) I would highly recommend getting on Tekla. I’m documenting this so some poor soul doesn’t waste a day trying to debug this: Do you see the problem? First insert the beam, and then apply the UDA and it should…
Our use case? How can we check? Voila! Now it’s hard to make a mistake. If you want to get all materials – it’s very similar to the above. Use the CatalogHandler.GetMaterialItems() method along with the materialItem.MaterialName property. The code to actually do that – I will leave as an exercise to the reader.

Q22836 – St Mary’s Footbridge TAP3 MC T2
Q23034 – Moore Park PV&C – Balustrade Type BA5
Q26400 – Moore Park PV&C – Bridges and Ramp
Q24123 – IC3 Super West Project – Handrails and Balustrades




| The Standards we Follow | |
| Our Services | Steel Detailing Shop drawings to Steel Detailing | AISC | ASTM |
| Steel Estimation We build a tekla model from Structural drawings in Tekla Produce the reports, give you the model and the reports with expert comments. | |
| Standards we follow | Steel detailing AISC 360 (Specification for Structural Steel Buildings): The foundational standard for the design, fabrication, and erection of structural steel. |
| ASTM Specifications: All materials must be identified and traceable to specific ASTM standards (e.g., A992 for wide flanges, A36 for plates). | |
| OSHA Standards | We follow OSHA Standards -1926.754, 1926.755, 1926.756 |

I spoke to a TL re: something that was missed on an MTO. The reason given was that it was a junior who did the work, and that this work is not usually checked. The Consequences of Bad Work? How to avoid “missing things”?
Also: Should you charge for your opinion? Someone asks you for a professional opinion on an area that is not your area. Rule 1: If it is not your area of expertise: don’t give your opinion Rule 2: If it is your expertise: make sure you charge for it Case Study: [To be inserted]
We have professional indemnity insurance at Tek1. As part of our policy – on anything which may give rise to a claim you are not allowed to admit liability or mistakes. In fact, people will try to get you to admit – to make you the person at fault – when it could be the…
Key links: Please supply checklist and special notes with every take off report you complete. What is the purpose of an MTO? The Actual MTO report: (a) Full Material List (b) The second: Excel – Material List – which shows all sub-totals. (c) IFC file. (d) db1 file (e) and if applicable, your .dwg line…