This page show cases some of the Steel Detailing projectgs completed in Melbourne, Sydney, WA, Brisbane Tek1 has completed

Imagine you’re reviewing a staircase drawing, and you see this note:
“8 THK CONTINUOUS FOLDED PLATE TREADS AND RISERS.”

Sounds fine, right? But here’s the catch—is it actually possible to fold a single plate continuously for an entire stair flight? 🤔
A plate cannot be folded continuously to form multiple stair treads and risers because:
Instead of one continuous folded plate, each tread and riser should be a separate, single-folded plate. These individual elements can then be welded or bolted together to form a strong and practical staircase.
So next time you see a similar detail, take a closer look—is it actually buildable?

This is Challenging Metal Works Project by Tek1 for one our long standing clients in Melbourne
TEK1 is share our involvement in the West Gate Tunnel Project – specifically with Bridge #75 Veloway WD to Footscray Road. As part of this prestigious infrastructure development, we successfully detailed the steel staircase cladding, adding both functionality and visual appeal to the project.
Read more: Staircase Cladding -Tunnel Project | MelbourneThe cladding is securely fixed to the main steel structure of the staircase, requiring precise coordination between steel and aluminium detailing. Our team at TEK1 ensured that all fixing points were carefully detailed to accommodate the unique requirements of perforated cladding, maintaining structural integrity and ease of installation.
The aluminium cladding for the staircase not only adds to the project’s aesthetic value but also demonstrates our expertise in combining materials for functional and visually striking results.

As a steel detailer, nothing compares to the satisfaction of seeing your detailed model come to life. I recently had the opportunity to witness the fabrication of one of my detailing projects in Australia. Balustrading for Foot Bridge



The detailing was executed seamlessly, with no challenges for the fabricator or erectors. It was fulfilling to see the effort and attention to detail pay off in real-world application.


This project was detailed a while before. However I am posting this now
We have detailed transfer structure, conveyors, Chutes, Vibrating Grizzlys on this particular projects. These Items are typical for mining projects. There is a fair bit of care required when it comes to bracing to avoid weld clash.
At Tek1, it is our standard practice to check all handrails , stairs, ramps ladder to relevant standard. We do not simply go by the Engineer Architect drawings. We check whether it will comply.
Actually, once can simply tell us, put a stair here, give us the heights and spacing available, we could detail a stair for you, which will comply to Australian standards (AS1657 or AS1428 as the case may be)
This video show cases a few elements of the mining structure.

Steel detailers play a crucial role in ensuring that connections between precast & steel are both practical and efficient. In this blog, I’ll share my experience with the challenges I faced in steel-to-precast connections.
Design
The design specified two ferrules on both sides of a precast wall. However, following this design may leads to clash between the ferrules.

The Proposed Solution
To address this, I suggested using a CHS (Circular Hollow Section) conduit. This approach would allow a single bolt to be used for both sides of the connection, ensuring proper alignment .(Providing ferrules at a different location will not be feasible as we do not have sufficient edge distance)

The Outcome
The structural engineer approved the proposal but recommended an alternative solution: double-ended ferrules. The query is now with the builder to decide which method suits their construction process best.
Key Takeaways
Chose alternate sections quickly and easily
Also, if you are thinking of replacing one section with another, you can easily compare, LxW , Weight Per Meter, Section Modulus.

How it will work
Watch this space for announcements when training will commence
How this is going to work
Join our training course by self registering at www.training.tek1.com.au
You will be presented with our online training material with excercises and questionaire which you can complete at your own pace.
Self Accreditation is free. Once you complete all the training courses and answer all the questions correctly, You will be issued a certificate for whatever it is worth. The certificate will be a comptuer generated certificate your potential employer can view at training.tek1.com.au.
If you go through all the materials dilegently and answer all questions, complete the excercises properly, you will learn something which will be valuable for potential emplyer.
However, you can game the system.
For this certificate, you basically do the free course. But our competent staff will interview you, test you, make sure you are worthy of a Tek1 Accreditation
There will be charges, which you will have to pay.
Paying the charges does not gaurantee accrediation.
This again based on the material presented on the Free training, but a tutor will assist you once a week with taking you through the course, demonstrating how to do things. There will be a fee to be paid.
There is not gaurantee of employment. The fee you are paying is for getting tutor assistance.
However, if you do well, we will employ you depending upon available postions
As of 14/01/2025 we have a minimum of 10 openings.

Author: RAJ (Arokiaraj Arputharaj), an expert in simplified structures for residential projects, also specializes in structural steel drafting.
Simple to fabricate and easy to install, is the mantra when it comes to structural steel for residential.
Residential projects run on a budget. When they do, cost saving detials are usually missed by the engineer and architect.
At Tek1, we see, check and recommend cost saving alternatives. 90% of the time our proposals are accepted saving cost to fabricator and builder.
Our simple philosophy is , if it complicated to detail, it will be more expensive for fabricator. Keep it simple.