Category: Steel Detailing Blog

This page show cases some of the Steel Detailing projectgs completed in Melbourne, Sydney, WA, Brisbane Tek1 has completed

  • CARRUM NORTH BRIDGE

    CARRUM NORTH BRIDGE

    TEK1 Successfully done this Carrum bridge by one time detailing without any hitch.

    Isometric view of Carrum bridge

    Elevation view of Carrum bridge
    Bridge Adjoining view

    3D-View of bridge

    Bridge End view
  • Mosnam Metro – Renovation

    Mosnam Metro – Renovation

    Author: Pon Dhileepan

    A set of buildings in Mosman NSW are renovated. The front walls, some windows, doors & a roof are retained to maintain the heritage. The entire interior, GF & FF slabs, some roofs, internal walls etc are made new.

    Existing Structure – Buildings Inside Red Polygon

    Temporary steel frames are used to support the walls to be retained. These remains intact throughout the demolition process until new steel & concrete take their place.

    Not all the internal structure are entirely demolished or all the temporary structures are entirely erected in a stretch. A clear understanding of the sequence of demolition and erection of temporary structure work is vital. Connections given by the structural engineer some times hinder the erection process. It is the duty of the steel detailer to propose new connections accordingly.

    Walls to be Retained
    Temporary Steel Frames to Support the Walls

    New GF concrete slab is laid. New steel columns are added at the GF level to support the FF slab. Steel headers are added to exiting openings that lost support. New concrete walls cover the back & a side of the building. Roof steel rafters are supported between the existing front walls and the new back walls.

    A few retained floor joists are stiffened using additional purlins.

    New Building After Renovation
    New Building Without Roof
    Newly Added Structural Elements
  • Proposed Residence

    Proposed Residence

    TEK1 did a detailing for proposed residence project for reputed client in Australia.This project includes lot of timber beams. TEK1 will provide all the timber supports which connected to steel.

    We did not miss any of the connections & finished this project without any error.

  • Fort school Building-A & D

    Fort school Building-A & D

    About this project?

    Succesfully completed.
    Tight schedule.
    Lot of analyzing with existing steel and walls. No problems whatsoever.

    Isometric view of Fort school Building-A & D
    Isometric view of Fort school Building-A & D
    Main steel – Isometric view of Fort school Building-A & D
    Main steel – Plan view of Fort school Building-A & D

    Detailed by Vignesh & Shahul hameed

  • Lygon court plaza stair

    Lygon court plaza stair

    TEK1 finished this stair project. TEK1 not only model stairs as per design.We will check the stair design against the standards.

    We have checked this stair design against AS1428.

  • Erection Plan Set out Dimensioning

    Erection Plan Set out Dimensioning

    Today I had a site call about a set out dimension.

    Reason for call

    Dimension for set out from a Grid line outside the Building.

    AWNING SET OUT DIM