TEK1 completed a steel stair project for a prominent organization in Australia. Our primary scope was to provide the detailing drawings for the steel stair. However, the client also requested that we provide the support cleats for the balustrade.

Although the balustrade itself was outside our scope, the support cleats had to be welded to our steelwork, making their coordination our responsibility.


To ensure a perfect fit, we worked closely with the team responsible for the balustrade model. Through several coordination meetings with the client and the design team, we finalized the cleat locations and incorporated them into our detailing.


We are proud to be a part of the team in Mildura Christian College project.
Our detailing team worked closely with architects to ensure tolerances and offsets were met without compromising design intent With a limited fabrication and erection window, our detailing team adopted a fast-track workflow using Tekla Structures for 3D modeling.
This allowed us to provide early shop drawings for procurement and parallel review of sections still under coordination.






The minimum washer size is 3 mm. This could be different. If nothing is mentioned use 3 mm.
The minimum bolt stick out should be 1 pitch. For M20 it is 2.5 mm. Use 10 mm stick out.
Also there is grout. Pockets when cast could be of different depths. Use design grout of 15 mm minimum.
The top of the bolt should be 35 mm below slab level to prevent concrete Cracking.
Hence to be practical use 100 mm pocket depth with a base plate thickness of 16 mm and bolt size of 20 mm.