  • Lets learn Some Erection feasibility Checks

    Lets learn Some Erection feasibility Checks

    Things to be checked, if we get a spigot connection for a column

    When we have a spigot connection, at top of the column and a base plate connection at bottom of the column, first we must check the clearance provided for the movement of the column in the spigot to avoid any difficulties during erection.

    If the clearance is not sufficient, we must address the issue to the client along with some proposals. In our condition the following Suggestions were provided.
    We can postfix the Chemsets at any one side of the column ends
    We can increase the clearance to enable sufficient erection clearance for the column.

    In the below case, the design demands to pre-fix the chemset bolts and have provided only 50mm clearance for the spigot movement.

    Refer below snaps from model & structural design.

    In the above snap, the bottom of column has 10 thick base plate with Ø12 Chemset bolts and the top of the column is connected to the slab through the spigot which has 10 thick top plate with Ø12 chemset bolts as per the structural design requirement.

    The structural engineer advised to pre-fix the chemset bolts.

    So, we need to check for erection clearance to install the column.

    The clearance between Soffit to the top of slab is 2940mm (Refer model snap). When we deduct the projection of the chemset at top 30mm (10mm top plate thick + 20mm projection) and at bottom 45mm (15mm grout + 10mm base plate thick + 20mm projection) from the slab to slab clearance (2940mm) we get 2865mm (2940-30-45=2865).

    But the length of the column (when the spigot is fully inside the column and the top plate only projects out) is 2865 (column length) + 10 (Top plate of spigot) = 2875 mm which is 10mm more than that of the clearance between chemset projections.

    So, considering this 10mm extra length and providing 15mm clearance at top and bottom, we have prepared a markup proposing 50mm (clearance as per design) + 40mm (10mm extra length of column + 15mm clearance on top & bottom) = 90mm spigot movement for easy erection and this proposal was sent to client.

    Client had understood the issue and agreed our connection proposal with 90mm clearance.

    Our analysis towards erection possibility along with client’s attention and understanding of the issue that we have addressed made the columns easy to erect.

  • Proposed Residence

    Proposed Residence

    TEK1 did a detailing for proposed residence project for reputed client in Australia.This project includes lot of timber beams. TEK1 will provide all the timber supports which connected to steel.

    We did not miss any of the connections & finished this project without any error.

  • Millbrook Maintenance Stair

    Millbrook Maintenance Stair

    Author : Ramakrishnan. L

    TEK1 recently did the 5-different types of railway Maintenance stairs with varying chainage. We are using our own macros to Model & detail these stairs pretty easier.

    Please refer to below for few model snaps

  • Concorde Park (Lot 33-35)

    Concorde Park (Lot 33-35)

    Author: Ramakrishnan .L

    Tek1 handled both the precast and steel detailing, obviating the need for you, the client, to coordinate between the two trades.

    This allows us to expeditiously sort out RFIs / design issues – which means faster drawings.

    Check out the images:

  • NEW MULTI DWELLING RESIDENTIAL  DEVELOPMENT

    NEW MULTI DWELLING RESIDENTIAL DEVELOPMENT

    Location : 31 VALLEY FAIR DRIVE, NARRE WARREN

    TEK1 Completed this multi-dwelling residential project with out any hitch.

  • 541 Kororoit Creek Road

    541 Kororoit Creek Road

    • Urgent job – completed by due date, without rework.
    • Client was satisfied.


  • Spiral Stair – Batman Avenue

    Spiral Stair – Batman Avenue

    Author: Ramakrishnan L

    Tek1 has completed this rather complicated project “Circular Stair at Batman Avenue”.

    The project was complex and demanded a very high level of detailing Knowledge. We have done wonderfully well in completing this project without a hitch.

    If you want steel shop drawings for a project you are working on, please feel free to call Koshy on: (03) 9560 6397 / +61 3 9560 6397

  • WATERGARDENS STATION – Sunbury line in Victoria, Australia

    WATERGARDENS STATION – Sunbury line in Victoria, Australia

    We have done a Lift & Staircase steel structure detailing on watergadens station located in Victoria.

    TEK1 have done wonderfully well in completing this project without a hitch.

    If you want steel shop drawings for a project you are working on, please feel free to call Koshy on (03) 9560 6397 / +61 3 9560 6397