  • Bubbledeck Slab Shop Drawing

    • Extraction of individual Bubble deck Slab  from Layout to Sheet
    • Calculation for Volume and weight for  minimum slab pour in Factory
    • Placement of Lifters on the Min slab pour to lift the Min slab after pouring and curing form the factory
    • Reinforcement setout panel copied from the Source panel
    • Reinforcement Arrangements are done based on the Original Slab depth value given to the copied panel
    •  Trimmer bars If the panel has Profile breaks and column Opening
    • Dimensioning of Panel ball set out for Panel Profile, Balls  and cast in components present in the Min Slab Pour
    • Dimensioning of Reinforcement set out for Slab cover from the start of reo bar.  Reinforcement setout Point selection and dimension for Truss arrangement.
    • Heading Notes for Panel ball set out with finish notes and Reinforcement setout
    •  Notes for Block out and Penetration in Panel Ball setout
    • Notes for Trimmer Bar , Splice Bar and Loose U Bars in Reinforcement setout
    • List part for the cast in Components present inside the min concrete Slab