Month: October 2021

  • The Entrance

    Every project has its time fixed. Sometimes the Project Manager or the client might miss some documents that are useful for detailing. As a detailer we must know when to request and what to request the client if any details or specification sheets that are missing. For example request a site measurement if the new scope is attached with existing site or confirm with the clients if you are proposing any new connection and so on.

    Blog by Bharath – Tek1.
    Visit www.tek1.com.au for further enquiries.

  • SPORTS_PAVILION

    Sport Pavilion is a simple project perfectly timed and done. The project was delivered on time. Few challenges faced in this project is the location of Tie beam. The beam seems be running where a full height window appears. Which affects the aesthetic view of the building. We informed the clients in prior to detailing and get the issues clarified before erection. Which made the building a wonder in reality.

    Snip of query sent
    3D Fly-Over
    Snip from Model
    Snip from Model

    Blog by Bharath – Tek1.
    Visit www.tek1.com.au for further enquiries.

  • Bacchusmarsh

    Sometimes in the process of converting a 2D design drawings to 3D model, we may face many issues. Like the conflict in design documents , clash in the structure and so on. Such issues can be resolved at the preliminary stage itself by the detailer and helps the client to have a complete view of the structure before construction. How to solve these issues? Just by intimating the Project manager/ Client with a simple mark-ups as below.

    Column layout confirmation
    Detail Confirmation
    Snip from model
    Snip from model

    Blog by Bharath – Tek1.
    Visit www.tek1.com.au for further enquiries.