Today I had a site call about a set out dimension.
Reason for call
Dimension for set out from a Grid line outside the Building.

Dimension Bolts
Set up Instructions


Instructions:
Trouble shooting: it doesn’t work!



TEK1 done a detailing work for the link bridge.The complication of this project is site measure. We have to co ordinate with the existing building site measure to finish this work.Most of the structural members are connected to the existing concrete.We have coordinated with site surveyor & got the dimension we want to connect the steel.
TEK1 completed this job without any mess.We have provided a good info to fabricator as well as erector to finish this project smoothly.


Author: Pon Dhileepan
This single storey residential house of dwelling area 294m2 is built in Seymour, Victoria.
This building is neither entirely load bearing structure nor framed structure. It is a composite structure. The roof purlins & beams are supported by steel columns at some area and by block walls at other area.
The initial design lacked coordination between the structural engineer and the architect. We had raised about 44 RFIs to them. The response delayed the project but the RFIs raised by Tek1 saved a lot of reworks and money at the site.