Month: November 2022

  • NEW MULTI DWELLING RESIDENTIAL  DEVELOPMENT

    NEW MULTI DWELLING RESIDENTIAL DEVELOPMENT

    Location : 31 VALLEY FAIR DRIVE, NARRE WARREN

    TEK1 Completed this multi-dwelling residential project with out any hitch.

  • Kiama Awning

    Kiama Awning

    Came together without hitches.

    Short timelines.

  • Skid

    Skid

    Author: Pon Dhileepan

    This is machinery skid made of steel. The main frame made of UB200*18 holds an Alfa Laval Filter (ALF) and a pump. A pedestal out of 75*6EA is bolted to the UB200*18 frame for a strainer. 600mm wide walkway made of chequered plates are placed on top to access the mechanical units. Holes are pre drilled in the steel frame to match the size & location of the mechanical units.

    Steel Skid Frame with Walkway Chequered Plate
    Steel Skid with Mechanical Units
  • West Gate – Bridge

    West Gate – Bridge

    A small bridge on the Westgate tunnel project.

    Went up without issues.

    3D-View of west gate bridge
    3D-View-End extension of est gate bridge
    3D-View-End extension of West gate bridge
    3D-View-End Barrier of West gate bridge
    3D-View-Centre Barrier of West gate bridge

  • TEXTOR PLATFORM

    TEXTOR PLATFORM

    About this project?

    • Succesfully completed.
    • Tight schedule.
    • No problems whatsoever.
    ISOMETRIC VIEW OF TEXTOR PLATFORM
    ELEVATION VIEW OF TEXTOR PLATFORM
    MAIN STEEL VIEW OF TEXTOR PLATFORM
    MAIN STEEL VIEW OF TEXTOR PLATFORM

    Detailed by Vignesh.

  • 541 Kororoit Creek Road

    541 Kororoit Creek Road

    • Urgent job – completed by due date, without rework.
    • Client was satisfied.


  • Sliding Gate

    Sliding Gate

    Author: Pon Dhileepan

    This sliding gate is modelled to match the existing balustrade (Drawn in red colour). A steel frame covered with aluminium cladding is guided by rollers at the bottom and the rollers attached in the posts.

    Gate Front View
    Gate Back View
    Guiding Rollers attached to Posts