Author: admin

  • SHED | DARETON NSW

    SHED | DARETON NSW

    Darenton-NSW
    Darenton-NSW

  • Shed | Alice Springs

    Shed | Alice Springs

    We did detailing only. Model was given to us

  • SHEDS | Class 9 Structures

    SHEDS | Class 9 Structures

    Steel Detailing for Sheds

    Expert Detailing for Class 9 Buildings , Sheds, Farm Sheds

    We service Victoria, NSW, Brisbane, WA, NT, SA

    • Design of Sheds

    • DAREN TOWN NSW

      SHED | DARETON NSW

    • MPH SHED ALICE SPRINGS

      Shed | Alice Springs

  • Steel Detaling | LA

    Steel Detaling | LA

    Shop drawings to Steel Detailing | AISC | ASTM

    The Grand LA

    Los Angles

    Our Services

    Expert Steel Detailing Services

    Our Services for the City

    The Standards we Follow
    Our ServicesSteel Detailing
    Shop drawings to Steel Detailing | AISC | ASTM
    Steel Estimation
    We build a tekla model from Structural drawings in Tekla
    Produce the reports, give you the model and the reports with expert comments.
    Standards we followSteel detailing AISC 360 (Specification for Structural Steel Buildings): The foundational standard for the design, fabrication, and erection of structural steel.
    ASTM Specifications: All materials must be identified and traceable to specific ASTM standards (e.g., A992 for wide flanges, A36 for plates).
    OSHA StandardsWe follow OSHA Standards -1926.754, 1926.755, 1926.756

    Interesting Steel Structures in Los Angeles

    Ribbon Of Light
    Ribbon of LIght

    Ribbon of Light

    650 S Clarence St, Los Angeles, CA 90033

  • Stair Construction

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)

    Steel or Timber Stair

    You want to install a stair for your builidng. Need to decide what type of construction should you use for your stair.

    Lot depends on what is the type of building, where is the stair, what is the asthetics required.

    In a residential building, probably what matters most is the asthics for a millionaire residence, cost and asthetics for a middle class house and probably just cost for a low end residential.

    (more…)
  • Projects by Rama Krishan

    • Cloning of Assembly Drawings in Tekla

    • TRAFFICE BARRIER RAILING

    • Project :Audi Centre – Myaree

    • Steel Fabrication Drawing

    • How We are helping our Client Save $100,000s on the Iconic “EMU IN THE SKY” Project

  • Steel Detailing Projects | Melbourne | Sydney | WA

    Steel Detailing Projects | Melbourne | Sydney | WA

    • Sydeny Fabricators trust in Tek1

      Steel Detailing Projects | Melbourne | Sydney | WA

    • TEK1’s Steel Detailing for Sydney Metro – Resolving Design Challenges – 8

    • Cloning of Assembly Drawings in Tekla

    • Lathe Place, Unanderra

  • Staff Memos

    Staff Memos

    • Memo #6 – Drawings not to be issued “IFC” markings without approvals

      Here is a memo we received from one of our clients. Such memos are not infrequent: I am pushing for stamped drawings, however from the IFAs issued there should be no changes made. I need to begin the steel ordering process tomorrow. There is a lead time on the ordering of the steel, and by…

      Read more: Memo #6 – Drawings not to be issued “IFC” markings without approvals
    • How to programmatically create bolt list reports from selected model objects (Tekla Open API)

      Reports can be generated fairly easily, manually. But how do you do it programmatically using the Tekla Open API? Please see below for a code sample: Programmatically Extracting Report Values Now, if you want to generate the values programmatically, in memory, and then process them somehow into an excel output, consider the following code sample…

      Read more: How to programmatically create bolt list reports from selected model objects (Tekla Open API)
    • Extracting Bolt Distances of Single Part Drawings (Beams) With an Output In Excel – Part 3 (Tekla Open API)

      In the last part we left off having obtained all the bolt distance and placing them in a domain object. In this instalment we will try to export all that data into an Excel Spreadsheet. Please note that the following code is untested – unfortunately there was a lightening storm in Melbourne which short circuited…

      Read more: Extracting Bolt Distances of Single Part Drawings (Beams) With an Output In Excel – Part 3 (Tekla Open API)
    • What is the difference between Freezing a layer vs Turning it off? (AutoCAD tips)

      A tyro to AutoCAD will immediately notice that he or she has two options available to him – both of which ostensibly render similar results: freezing a layer and turning it off. But what is the real difference? When you turn a layer off, it is still loaded into memory. AutoCAD is keeping track of…

      Read more: What is the difference between Freezing a layer vs Turning it off? (AutoCAD tips)