Category: Tekla training

  • Weld Clearance

    Make sure there is sufficent clearance for welds.

    The cost of not providing weld clearance is significant.

    These type of errors chips away at our credibility

  • Purlin Brackets

    Lysaught provides different types of brackets.

    Whe you are modelling choose the appropriate types

  • Designing a Multi-Level Staircase: Common Mistakes and Key Considerations

    Designing a Multi-Level Staircase: Common Mistakes and Key Considerations

    When designing a staircase, one of the most overlooked aspects is the correct distribution of risers, especially when integrating a mid-landing with a falling finish.

    Understanding the Mid-Landing Design:

    In this case, the staircase consists of two flights turning 180° with a mid-landing. The purpose of this stair is not only to provide access between Ground Floor (GF) and Level-01 but also to facilitate movement to the mezzanine level from the mid-landing. The design for the mid-landing incorporates a 10mm plate with a 50mm paver on top. However, an important requirement was added: allowing for a fall in the paver to prevent water stagnation.
    We received an instruction to keep the landing RL 20mm lower than the door near the mezzanine level to incorporate falls in the paver.


    Common Mistake in Flight-02 Design
    :


    For a steel detailer, just paver RL which is 20 mm below the door level & 50mm paver thickness is enough to place the steel below. The sloping surface in the paver will be taken by some other parties. But the key thing to notice here is, the slope continues to the bottom of flight-02 as well.
    At the end of Flight-01, the paver thickness remains 50mm.
    Near the mezzanine door, the thickness increases to 70mm (50mm + 20mm fall).
    A frequent error occurs when designing Flight-02. Many assume the risers should be evenly divided between Level-01 FFL (Finished Floor Level) and the RL of the mid-landing, neglecting the impact of the paver thickness variation.


    To achieve the correct stair profile:

    The mid-landing RL should be set based on the increased paver thickness near the flight-02.
    Flight-02 risers should be distributed between Level-01 FFL and the actual top surface of the paver (which is 70mm at the bottom of Flight-02, not 50mm).
    Else, the first riser in the flight-02 will be comparatively smaller than the rest of the risers.

    Key Takeaways for Stair Detailing:

    Account for varying thickness: Do not assume uniform paver thickness; adjust accordingly at different points.


    Correct riser distribution: Ensure the risers of the second flight are calculated based on the actual mid-landing RL, factoring in paver thickness variations.


    Clarify detailing instructions: Steel detailers do not need to model the paver exactly but must ensure the mid-landing RL is accurately set.

    By paying close attention to these details, staircases can be designed more efficiently, reducing costly rework and ensuring a smooth construction process. Proper coordination between architectural and structural teams is essential to avoid misalignment and achieve a seamless build.

  • First TeklaTraining Video is Out.

    Those who are interested in self training, or to secure a job with Tek1’s back office in India, Please self register for the course below’

    Baharths Tekla Training Video in Tamil

    You have to self register.

    This is a single lesson at the moment.

    Please watch through the video.

    We will be adding questionairre to this lesson, watch out for this.

    In this week, there will an assisted lesson, where we will take you through in detail about this Lesson.

    To Benefit, you must have your own PC with Tekla Structures Installed. But have a computer with 8Mb Ram. and TeklaStrutures running.

    You also must have a good internet connection.

    The time of the assisted lesson will be annonced in 3 days.

  • Tekla Training

    https://www.tek1.com.au/28-show-ad-modify-drawing-views-telka-version-2020/
    https://www.tek1.com.au/lesson-26-drawing-automation/

    Lesson 25- Use Appropriate filters

    https://www.tek1.com.au/overlay-2d-annotation/
    https://www.tek1.com.au/lesson-23-stair-detailing/
    https://www.tek1.com.au/lesson-22-tapered-plate/
    https://www.tek1.com.au/21-base-plates/
    https://www.tek1.com.au/insert-reference-model/
    https://www.tek1.com.au/19-purlins-and-bridging/
    https://www.tek1.com.au/lesson-18/
    https://www.tek1.com.au/lesson-17/
    https://www.tek1.com.au/15-bolting
    https://www.tek1.com.au/lesson-15/
    https://www.tek1.com.au/lesson-14-member-schedule/
    https://www.tek1.com.au/move-and-copy-in-tekla/
    https://www.tek1.com.au/curved-beams/
    https://www.tek1.com.au/creating-columns/
    https://www.tek1.com.au/create-beams/
    https://www.tek1.com.au/cuts-and-fits/
    https://www.tek1.com.au/snaps-view-plane-work-plane/
    https://www.tek1.com.au/selecting-in-tekla/
  • Selection method for Reports Creation in Tekla

    While creating reports in Tekla Always ensure that selection men must be in objects selection. See below snaps

    OBJECTS SELECTION 

    COMPONENT SELECTION

    Above snaps clearly states reports must be taken while the members selected in objects selection option is turned on. Otherwise the report quantity will be less than the actual quantity.