Tag: steel detailing

  • Macquarie link bridge

    Macquarie link bridge

    TEK1 done a detailing work for the link bridge.The complication of this project is site measure. We have to co ordinate with the existing building site measure to finish this work.Most of the structural members are connected to the existing concrete.We have coordinated with site surveyor & got the dimension we want to connect the steel.

    TEK1 completed this job without any mess.We have provided a good info to fabricator as well as erector to finish this project smoothly.

  • Concorde Park (Lot 33-35)

    Concorde Park (Lot 33-35)

    Author: Ramakrishnan .L

    Tek1 handled both the precast and steel detailing, obviating the need for you, the client, to coordinate between the two trades.

    This allows us to expeditiously sort out RFIs / design issues – which means faster drawings.

    Check out the images:

  • NEW MULTI DWELLING RESIDENTIAL  DEVELOPMENT

    NEW MULTI DWELLING RESIDENTIAL DEVELOPMENT

    Location : 31 VALLEY FAIR DRIVE, NARRE WARREN

    TEK1 Completed this multi-dwelling residential project with out any hitch.

  • 541 Kororoit Creek Road

    541 Kororoit Creek Road

    • Urgent job – completed by due date, without rework.
    • Client was satisfied.


  • Spiral Stair – Batman Avenue

    Spiral Stair – Batman Avenue

    Author: Ramakrishnan L

    Tek1 has completed this rather complicated project “Circular Stair at Batman Avenue”.

    The project was complex and demanded a very high level of detailing Knowledge. We have done wonderfully well in completing this project without a hitch.

    If you want steel shop drawings for a project you are working on, please feel free to call Koshy on: (03) 9560 6397 / +61 3 9560 6397

  • WATERGARDENS STATION – Sunbury line in Victoria, Australia

    WATERGARDENS STATION – Sunbury line in Victoria, Australia

    We have done a Lift & Staircase steel structure detailing on watergadens station located in Victoria.

    TEK1 have done wonderfully well in completing this project without a hitch.

    If you want steel shop drawings for a project you are working on, please feel free to call Koshy on (03) 9560 6397 / +61 3 9560 6397

  • Ferrules and bolt length

    Items to take care

    1. Refer Ferrule Catalogue – https://reid.com.au/upload/modules/document_loader/Anchoring_Solutions_Design_Guide_2011.pdf
    2. Check whether ferrule face is flush with concrete or rebated.
    3. Check Thread length in Ferrule
    4. Check total thickness of bolted items including washer.
    5. Make sure that the bolt specified is at least 5 mm less than (WASHER THICKNESS + Plate thicknesses + Rebate in concrete + thread Length)

    Traps

    1. Bolt too long – If thread length in ferrule not taken into consideration
    2. Bolt too short – If washer, Rebate Plate thicknesses not taken into consideration

    Main issue here is the entire length of bolt is decided by the Cut length the modeler provides.

    If proper care is not taken, then there will be a site issue