-

Millar Warehouse
Tek1 has successfully completed the industrial project for the reputed organisation in Australia. This project does not have any structural design drawings. Instead, the client has provided sample design drawings. Therefore, we need to coordinate our structural design with the architect’s drawings. We need to provide structural support for an overhead crane. TEK1 has provided…
-

PROPOSED WAREHOUSE DEVELOPMENT AT 29-33 HAWKER STREET.
-
WAREHOUSE LINK ROOF
TEK1 Successfully done this warehouse link roof by one time detailing without any hitch.
-
WAREHOUSE STRUCTURAL STEEL SHOP DRAWINGS
This is a Video of Bunnings Warehouse Bunnings Warehouse was a design and build project for us. We have been given original structural drawings to make it suitable for manufacture overseas in China. These instructions along with very short delivery times added significant challenges in shop drawings. One of the requirements by the clients was…
-

Steel Stairs | Melbourne | Sydney | WA
-

SHEDS | Class 9 Structures
-

Fast Track to a Tekla Career
-
Exporting Tekla Models to Strumis in bswx format
-
How to Create a Curved Beam using the Tekla Open API (c#)
-
Tek1 RFI System
-

Mezzanine floor & stair handrails
-

Do not stick your neck out
-

When an LGS Truss Isn’t Enough : Why We Replaced It with a Hot Rolled Steel Beam
-

RFI to Reality: The Coordination Journey of Aspire Mickleham
-

How to Overcome Transportation Limits in Large Truss Projects
-
Dont Lose time with missing dimensions
-

Changing Vertical Leg Position for Easier Steel Erection
-

Spotting the Hidden Error in an “Approved” Stair Project
-
Section Profiles for SS and Aluminium

Leave a Reply