  • Mosnam Metro – Renovation

    Mosnam Metro – Renovation

    Author: Pon Dhileepan

    A set of buildings in Mosman NSW are renovated. The front walls, some windows, doors & a roof are retained to maintain the heritage. The entire interior, GF & FF slabs, some roofs, internal walls etc are made new.

    Existing Structure – Buildings Inside Red Polygon

    Temporary steel frames are used to support the walls to be retained. These remains intact throughout the demolition process until new steel & concrete take their place.

    Not all the internal structure are entirely demolished or all the temporary structures are entirely erected in a stretch. A clear understanding of the sequence of demolition and erection of temporary structure work is vital. Connections given by the structural engineer some times hinder the erection process. It is the duty of the steel detailer to propose new connections accordingly.

    Walls to be Retained
    Temporary Steel Frames to Support the Walls

    New GF concrete slab is laid. New steel columns are added at the GF level to support the FF slab. Steel headers are added to exiting openings that lost support. New concrete walls cover the back & a side of the building. Roof steel rafters are supported between the existing front walls and the new back walls.

    A few retained floor joists are stiffened using additional purlins.

    New Building After Renovation
    New Building Without Roof
    Newly Added Structural Elements
  • Proposed Residence

    Proposed Residence

    TEK1 did a detailing for proposed residence project for reputed client in Australia.This project includes lot of timber beams. TEK1 will provide all the timber supports which connected to steel.

    We did not miss any of the connections & finished this project without any error.

  • Fort school Building-A & D

    Fort school Building-A & D

    About this project?

    Succesfully completed.
    Tight schedule.
    Lot of analyzing with existing steel and walls. No problems whatsoever.

    Isometric view of Fort school Building-A & D
    Isometric view of Fort school Building-A & D
    Main steel – Isometric view of Fort school Building-A & D
    Main steel – Plan view of Fort school Building-A & D

    Detailed by Vignesh & Shahul hameed

  • Lygon court plaza stair

    Lygon court plaza stair

    TEK1 finished this stair project. TEK1 not only model stairs as per design.We will check the stair design against the standards.

    We have checked this stair design against AS1428.

  • Millbrook Maintenance Stair

    Millbrook Maintenance Stair

    Author : Ramakrishnan. L

    TEK1 recently did the 5-different types of railway Maintenance stairs with varying chainage. We are using our own macros to Model & detail these stairs pretty easier.

    Please refer to below for few model snaps