  • Look Out for Bad Connection Details

    Look Out for Bad Connection Details

    Bad Connections

    There are many young engineers out of college in the structural engineering business. They probably are not very much aware about the costs involved with fabrication.

    As detailers, it is our responsibility to look out for bad connections and ask an rfi for alternate connections.

    Please look at this particular one. It is unnecessarily complicated. And there are so many of them. It is all hidden and is not intended to be an architectural masterpiece.

    We as detailers become a lot more valuable if we can save money for the detailer.

     

  • Preston tram shed – Stair & handrail

    Preston tram shed – Stair & handrail

    Tek1 has successfully completed the commercial project for the reputed organisation in Australia.

    Initially, the scope of work involved the main steel for the shed, which we have successfully completed. (Preston tram shed). Subsequently, the client assigned us an additional scope, which includes the handrails for the mezzanine level, as well as stair 1 and stair 2.

    Stair 1
    Stair 2
    Mezzanine level handrail

    We have successfully completed the handrail detailing without any errors, and the client is satisfied with the quality of our work.

  • William street Privacy screens

    William street Privacy screens

    Tek1 has successfully completed the commercial project for the reputed organisation in Australia.

    The scope of work involves providing privacy screens and their supports. We have encountered challenges with the aluminum screen bends during the project.

    Initially, we received instructions that each screen should have a bend in all four directions, which we modeled and sent for approval.

    Screen with bend on 4 sides

    However, the client later requested that we split the top and bottom of the screen and provide separate pieces to be welded to the main screen.

    Screen section view
    Screen end side

    Our client expressed satisfaction with our work.

    Screen support
    Post for screen support
    Post side view

  • Millar Warehouse

    Millar Warehouse

    Detailed by Ganesh & team

    Tek1 has successfully completed the industrial project for the reputed organisation in Australia.

    This project does not have any structural design drawings. Instead, the client has provided sample design drawings. Therefore, we need to coordinate our structural design with the architect’s drawings.

    Detailed by Ganesh & team

    We need to provide structural support for an overhead crane. TEK1 has provided the correct beam profiles for the structural support, and the client is satisfied with our design and shop drawings.

    Detailed by Ganesh & team

    Our main objective is to deliver high-quality drawings without any errors. TEK1 has successfully achieved this goal.

  • Glenfern Lifestyle park

    Glenfern Lifestyle park

    Detailed by Ganesh & team

    Tek1 has successfully completed the project for the reputed organisation in Australia .

    Lots of timber connections involved with steel in this project. TEK1 provided all the supporting members for timber.Client is happy with the connections that we have provided which is not in their design.

    Gym area
    Sports bar

     

     

  • M4 Cut & Cover – Tunnel road ceiling support

    M4 Cut & Cover – Tunnel road ceiling support

    Detailed by Ganesh & team

    Tek1 has successfully completed the industrial project for the reputed organisation in Australia .

    We have provided a ceiling support steel for the tunnel road. One of the main challenges we faced in this project was site measurement. We had to provide frames between two walls, and modeling using design dimensions was not feasible.

    Detailed by Ganesh & team

    As a result, we decided to model all of the frames using the site measurements. We received measurements of the rock surface which was uneven, so we had to calculate the face-to-face dimensions for each frame and then proceed with the modeling process.

     

    We are thrilled to announce that this project has been successfully completed without any errors!

  • Preston tram shed

    Preston tram shed

    Tek1 has successfully completed the industrial project for the reputed organisation in Australia .

    Lots of site measure involved in this project. TEK1 coordinated with builder & surveyor to finish the project without any error. Client is happy with our work.We are always focus on the client requirements.