Caladenia Court in Australia.
Tek1 has successfully completed a commercial project for a Caladenia Court in Australia.
The scope of work involves providing the Stair & the Awning steels. we completed this job in a day without any hitch.
Steel Detailing projects Show case projects details by Tek1 pty ltd

Tek1 has successfully completed a commercial project for a reputable organization in Australia.
The scope of work involves providing support for the cladding walls and awning roof. Due to frequent changes in the structural design, we have coordinated directly with the structural designer to update our model accordingly. This approach minimizes variation costs for both the client and the designer.
We held numerous meetings with the client to ensure there would be no mistakes during the installation process. As expected, the installation was carried out without any issues.
The client is highly satisfied with our work.

Tek1 has successfully completed a commercial project for a reputable organization in Australia.
The scope of work involved providing fencing for the station. The design drawings do not include dimensions for the fence slope and length. Therefore, we had to coordinate with site conditions to provide proper support for the fence. The fence doesn’t follow a straight line; instead, it follows the slope of the terrain, which was not indicated in the design drawings.
To address this, we modeled the fences based on site pictures and sketch drawings provided by the surveyor, which presented a significant challenge in creating accurate shop drawings.
We held numerous meetings with the client to ensure there would be no mistakes during the installation process. As expected, the installation was carried out without any issues.
The client is highly satisfied with our work.

Tek1 has successfully completed a commercial project for a reputed organization in Australia.
The scope of work involved providing floor , roof beams and stairs with handrails.
The primary challenge we encountered in this project was related to the stairs and handrails. Unfortunately, we did not receive connection details from the structural engineers. As a result, we took the initiative to propose and finalize all the connection details at Tek1.
This approach was well-received by the client and the structural engineers. The client is pleased with our work, and the structural engineers approved all of our connection proposals.
Furthermore, this project also included the measurement of the rock face at the site. We coordinated effectively with the site engineer to mitigate any challenges during the erection process.

Author: Pon Dhileepan
The Watches of Switzerland shop in Collin Street, Melbourne, has undergone a remarkable renovation, blending modern sophistication with heritage charm. A lift, 2 storey stair and frames for wall have been newly added.
The lift runs from the ground floor to the second. Initially, the lift columns were designed for 10.8m. Since, this is an indoor construction, we raised query about maneuvering the 10.8m columns inside & rotate them to their positions. Redesign happened & the columns were split to 4.5m max.
The key responsibilities in this project are:
Refer to the attached model snaps below:

Tek1 has successfully completed the commercial project for the reputed organisation in Australia.
This project has had several issues regarding the concrete connections. However, after having a productive conversation with the client and understanding their requirements, we are confident that we can provide excellent General Arrangement drawings for site and shop drawings.
The client is very pleased with our work, and we are committed to ensuring their satisfaction.