Tag: #TEK1-RAMKRISH-PROJECTS
-
How We are helping our Client Save $100,000s on the Iconic “EMU IN THE SKY” Project
How we saved our 30% (i.e. hundreds of thousands of dollars) in Costs on the “Emu In the Sky” Project Recently, we have been detailing one of Australia’s most iconic projects, the “EMU IN THE SKY.” The structure of this project is a 30m globe,and as part of the steel detailing, numerous connections are involved.…
-
The Importance of Adhering to Standards in Steel Detailing: A Case Study
As a steel detailer working on projects for public access areas or residential buildings, you must be familiar with the essential standards to ensure safety and compliance. In this blog post, we’ll delve into the significance of following standards, with a specific focus on AS1428, AS1657, and BCA, through a real-world case study near the…
-
Cardinia Road, Pakenham
Below are the Site Erection photos of Signal Platform & Walkway. We’ve done a lot of work on pedestrian bridges, anti-throw screens, platforms, walkways and stairs. Check out our steel projects for more examples.
-
Derrimut Bridge Pier Cladding
Unlock the potential of your architectural vision with our advance cladding structure detailing services.At TEK1 Pty Ltd, we take pride in our expertise in handling the most intricate and complicated cladding structures with precision and finesse. 🌐 Advanced Technology: Utilizing state-of-the-art 3D modeling tools and innovative software, we bring your cladding concepts to life with…
-
-
Millbrook Maintenance Stair
Author : Ramakrishnan. L TEK1 recently did the 5-different types of railway Maintenance stairs with varying chainage. We are using our own macros to Model & detail these stairs pretty easier. Please refer to below for few model snaps
-
Concorde Park (Lot 33-35)
Author: Ramakrishnan .L Tek1 handled both the precast and steel detailing, obviating the need for you, the client, to coordinate between the two trades. This allows us to expeditiously sort out RFIs / design issues – which means faster drawings. Check out the images:
-
NEW MULTI DWELLING RESIDENTIAL DEVELOPMENT
Location : 31 VALLEY FAIR DRIVE, NARRE WARREN TEK1 Completed this multi-dwelling residential project with out any hitch.
-
541 Kororoit Creek Road
Urgent job – completed by due date, without rework. Client was satisfied.